Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Prepare the machine.
Adapter
1
Screw (1/2 x 3-1/2 inches)
2
2
Locknut (1/2 inch)
2
Install the bagger adapter.
Hood assembly
1
Bag
3
3
Pin and hairpin-cotter assembly
2
Install the hood assembly and bags.
Upper tube
1
Lower tube
1
4
Hose clamp
2
Install the discharge tubes.
5
No parts required
–
Adjust the parking brake.
6
No parts required
–
Check the tire pressure.
Note:
Determine the left and right sides of the machine from the normal operating position.
1
Preparing the Machine
No Parts Required
Procedure
Perform the following procedure to prepare the machine for
attaching the blower and finishing kit.
1.
Disengage the PTO, move the motion-control levers
to the N
EUTRAL
-L
OCK
position, and set the parking
brake.
2.
Shut off the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3.
Repair all bent or damaged areas of machine deck and
replace any missing parts.
4.
Clean the machine of any debris on the deck or rear
part of the machine to ease installation.
4