![Toro 30162 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/toro/30162/30162_operators-manual_1133138009.webp)
Assembly
7
Installing the Flotation Springs
Note:
The right side uses the single spring
flotation system (Fig. 9).
1.
Move tension bracket rearward into farthest
notch (Fig. 8).
2.
Secure cable end to pin on deck support bar with
washer and cotter pin (Fig. 8).
3.
Repeat procedure for opposite side of deck
(Fig. 9).
1
2
4
3
M-4259
5
6
Figure 8
1.
Tehsion Bracket
2.
Cotter Pin
3.
Washer
4.
Cable End
5.
Deck Support Bar
6.
Double Spring (Left Side)
1
2
4
3
5
M-4302
2
Figure 9
1.
Tehsion Bracket
2.
Cotter Pin
3.
Washer
4.
Cable End
5.
Deck Support Bar
6.
Single Spring (Right Side)