HYDRAULICS & ENGINE MOUNTING
4-9
Toro 21” Aerator Service Manual
4
Jack Shaft & Output Shaft Installation
1. Replace the needed parts. Re-install the output shaft
and the jack shaft and install the chain. Leave the
lock collars loose (Fig. 119).
3. The bearing plate to bracket support assembly
dimension should be 5 inches from center-to-center
on the mounting holes (Fig. 121).
Fig. 119
24a
2. Install the bearing plate, bearings, and bearing
retainers (Fig. 120).
Fig. 120
25a
Fig. 121
26a
4. The sprockets should be exactly aligned with one
another (Fig. 122).
Fig. 122
27a
Содержание 23515
Страница 1: ...21 inch Aerator Service Manual Residential and LCE Products ...
Страница 2: ......
Страница 4: ...ABOUT THIS MANUAL THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...SAFETY INFORMATION 1 2 Toro 21 Aerator Service Manual 1 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 32: ...SPECIFICATIONS MAINTENANCE 2 24 Toro 21 Aerator Service Manual 2 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 76: ...TINE SYSTEM 5 8 Toro 21 Aerator Service Manual 5 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 77: ......
Страница 78: ...21 inch Aerator Service Manual Form Number 492 9335 ...