Installation Instructions

Installation

Loose Parts

Use the chart below to verify that all parts have been shipped.

Procedure

Description

Qty.

Use

1

No parts required

Prepare the machine.

Right baffle

1

Bolt (5/16 x 3/4 inch)

1

3

Nut (5/16 inch)

4

Install the right baffle.

Left baffle

1

Bolt (5/16 x 3/4 inch)

1

4

Nut (5/16 inch)

3

Install the left baffle.

Decal

1

5

Mulching blade

3

Install the decal and mulching blades.

1

Preparing the Machine

No Parts Required

Procedure

1.

Park the machine on a level surface.

2.

Disengage the PTO, engage the parking brake,
and move the motion-control levers outward to
the N

EUTRAL

-L

OCK

position.

3.

Shut off the engine and remove the key.

2

Preparing the Mower Deck

No Parts Required

Procedure

1.

Remove the mower deck from the machine;
refer to the

Operator’s Manual

for the machine.

2.

Turn the mower deck upside-down.

3.

Remove the existing mower blades; refer to the

Operator’s Manual

for the machine.

4.

Remove the nut securing the cutoff baffle to the
deck and remove the cutoff baffle (

Figure 1

).

Note:

Retain the baffle for converting back to

side discharge.

© 2020—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420

Register at www.Toro.com.

Original Instructions (EN)

Printed in the USA

All Rights Reserved

*3438-195* A

 

Содержание 139-3235

Страница 1: ...d Procedure 1 Park the machine on a level surface 2 Disengage the PTO engage the parking brake and move the motion control levers outward to the NEUTRAL LOCK position 3 Shut off the engine and remove the key 2 Preparing the Mower Deck No Parts Required Procedure 1 Remove the mower deck from the machine refer to the Operator s Manual for the machine 2 Turn the mower deck upside down 3 Remove the ex...

Страница 2: ...e mower deck using 1 carriage bolt 5 16 x 3 4 inch and nut 5 16 inch as shown in Figure 3 g314446 Figure 3 1 Nut 5 16 inch 2 Bolt 5 16 x 3 4 inch 3 Install the nut on the discharge rod where it was originally removed Figure 1 4 Tighten all fasteners 60 Inch Decks 1 Install the right baffle using 2 nuts 5 16 inch as shown in Figure 4 Tighten the fasteners by hand g314449 Figure 4 1 Nuts 5 16 inch 2...

Страница 3: ...olt 5 16 x 3 4 inch 3 Nut 5 16 inch Procedure 1 Install the left baffle using 1 bolt 5 16 x 3 4 inch and 3 nuts 5 16 inch refer to Figure 7 and Figure 8 g307325 Figure 7 1 Bolt 5 16 x 3 4 inch g307326 Figure 8 1 Bolt 5 16 x 3 4 inch 2 Nut 5 16 inch 2 Tighten all fasteners 5 Installing the Decal and Mulching Blades Parts needed for this procedure 1 Decal 3 Mulching blade Procedure 1 Install the dec...

Страница 4: ...ss grows at different rates at different times of the year To maintain the same cutting height mow more often in early spring As the grass growth rate slows in mid summer mow less frequently If you cannot mow for an extended period first mow at a high cutting height then mow again 2 days later at a lower height setting Using a Slower Cutting Speed To improve cut quality use a slower ground speed i...

Отзывы: