2
Preparing the Machine
No Parts Required
Procedure
1.
Remove the machine from the crate, park the
machine on a level surface or move the machine
to a machine lift.
2.
Engage the parking brake.
3.
Lower the mid-mount attachment.
4.
Shut off the engine and remove the key.
5.
Wait for all moving parts to stop and allow the
engine to cool.
6.
Move the mid-mount attachment control forward
and backward to relieve hydraulic pressure
(
).
g384033
Figure 3
3
Installing the Rear
Attachment Lift Frame
Parts needed for this procedure:
2
Short drawbar chain (17-1/2 inches)
1
Lift bracket
6
Carriage bolt (5/16 x 1 inch)
4
Washer (3/8 x 7/8 inch)
6
Flange locknut (5/16 inch)
1
Rear attachment lift frame assembly
2
Long rear-lift chain (25 inches)
2
Shackle
2
Clevis pin
2
Cotter pin
2
Flange-head bolt (3/8 x 1-3/4 inches)
2
Washer (2/5 inch)
3
Flange locknut (3/8 inch)
2
Chain sleeve
6
Flange-head bolt (1/2 x 3 inches)
6
Flange locknut (1/2 inch)
1
Capscrew (3/4 x 4-1/2 inches)
1
Locknut (3/4 inch)
1
Flange-head bolt (3/8 x 1-1/2 inches)
Assembling the Drawbar Chains
to the Machine
1.
Raise the operator’s platform (
).
Note:
The operator’s platform does not stay in
the upright position; restrain the platform or hold
it in place while completing this procedure.
10
Содержание 08839
Страница 29: ...9 Adjust the tilt of the multi tool carrier as needed Figure 39 g359127 Figure 39 29...
Страница 62: ...Notes...