Operator’s Manual
.
Installing the Chains
1.
Slide a chain sleeve over each chain (Figure 2).
G023975
3
4
5
2
6
1
Figure 2
1.
Drag mat
4.
Washers
2.
Chain sleeve
5.
Bolt (3/8 x 1-1/4 inch)
3.
Locknut
6.
Chain
2.
Align the end of a chain with 1 of the outer 2 holes
in the drag mat.
3.
Secure the chain to the drag mat with a bolt (3/8 x
1-1/4 inch), 2 washers, and a locknut, as shown in
Figure 2.
4.
Repeat steps 2 and 3 for the other side.
Installing the Drag Mat
1.
Align the end of a chain with the hole in the bracket on
that same side of the nail drag (Figure 3).
1
4
2
5
G023728
3
Figure 3
1.
Bolt (3/8 x 1-1/4 inch)
4.
Bracket
2.
Washers
5.
Chain
3.
Locknut
2.
Secure the chain to the bracket with a bolt (3/8 x 1-1/4
inch), 2 washers, and a locknut, as shown in Figure 3.
3.
Repeat steps 1 and 2 for the other side.
Installing the Carriers
1.
If the top plates, the nail plate, and the nails are
currently installed on the nail drag, remove them; refer
to the nail drag
Operator’s Manual
.
2.
Align the bolt holes of a carrier with the holes on the
front of the bottom plate of the nail drag (Figure 4).
1
2
3
4
G023727
Figure 4
1.
Carrier
3.
Bottom plate
2.
Locknut (2)
4.
Bolt (3/8 x 3/4 inch), 2
3.
Install 2 bolts (3/8 x 3/4 inch) through the bolt holes
of the carrier and the bottom plate, and secure them
with 2 locknuts.
4.
Repeat steps 2 and 3 for the other side.
2