![Tornatech GT-FluxFP Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/tornatech/gt-fluxfp/gt-fluxfp_operating-instructions-manual_1130758010.webp)
10
Tornatech - GT-FluxFP
START-UP
4 START-UP
Read the exact value when a consistent flow has been attained and the float has reached
a stable position. The pipeline must always be filled. Read the value at the greatest diame
-
ter (upper edge) of the float:
Fig. 7 Float
For the bypass meter it is important that when starting up the pump, the shut-off-/con
-
trol valve of the bypass orifice is opened min. 30 % to avoid hydraulic shocks or pressure
surges that could damage the bypass meter.
Reference point
Fig. 8 Rotation bypass meter
When the bypass meter is commissioned or set into operation, bubbles of air will initially
accumulate at the top part, which must be removed. For this purpose, the union nut (fig.
9, pos. 9) must be somewhat loosened during operation and the device must be rotated
by 360°, so that the air bubbles can escape. Then the bypass meter has to be positioned
vertically and the union nut has to be tightened once again.
Before pressure test in pipes, the bypass meter has to be disassembled
and the connection of the orifice plate has to be screwed pressure-tight
with the cap.