7
SYSTEM AIR PURGE PROCEDURE
2. Turn release valve counter-clockwise on full turn
to the open position.
1. Remove cover plate.
3. Rapidly pump the handle 6-8 times. Leave handle
in down position to expose oil fill plug.
4. With a flat blade screwdriver, push the oil fill plug
slightly to the side to purge trapped air from
system. (Use caution not to tear or puncture the
oil plug.)
5. Replace Cover Plate.
6. Turn release valve clockwise to the closed
position.
7. Jack is now ready for use. Check for proper pump
action. (Repeat steps if neccessary).
IMPORTANT: BEFORE FIRST USE
Perform the following Air Purge Procedure to remove any air that may have been introduced into the hydraulic
system as a result of product shipment and handling. This step is to be completed without any weight on the
jack.
Cover plate
Cover plate
Содержание BIG RED JACKS T84007
Страница 13: ...13 ASSEMBLY DIAGRAM...
Страница 29: ...SCH MA DE MONTAGE 29...
Страница 45: ...DIAGRAMA DE ENSAMBLAJE 45...