background image

1.1
Lay the Upper and Lower mast 
on the ground. Insert the upper 
mast into the lower mast 
as shown.

1.2 
Ensure that the upper mast is fully inserted, so that it is a snug fit.

1.3
Slide the luff tube of the sail 
(front edge) over the mast until 
the end of the mast reaches 
the end of the luff tube.

1.4
Tie the downhaul onto the pre-attached cleat on the lower mast. Pass the downhaul through the metal ring
on the sail, and then back through the cleat. As shown.

4

1. Rigging the Mast and Mainsail

Содержание Uno Plus

Страница 1: ...www toppersailboats com TOPAZ Uno Plus Rigging Instructions...

Страница 2: ...f with the craft before using it If this is your first craft or you are changing to a type of craft you are not familiar with for your own comfort and safety please ensure that you obtain handling and...

Страница 3: ...when down Any movement between the blade and the stock or the stock and the hull may cause steering problems Hull and fittings Small dents can be repaired by gently warming the hull with a hot air bl...

Страница 4: ...ted so that it is a snug fit 1 3 Slide the luff tube of the sail front edge over the mast until the end of the mast reaches the end of the luff tube 1 4 Tie the downhaul onto the pre attached cleat on...

Страница 5: ...The other end of the halyard will be attached to the jib when it is rigged 1 7 Open the mast gate Place the bottom of the mast in the mast foot and lift the mast up until it is vertical Once the mast...

Страница 6: ...boom 2 3 Take the free end of the outhaul towards the mast end of the boom and pass it through the cleat on the top of the boom Then pass the free end through the block on the mast end of the boom nex...

Страница 7: ...end of the kicker onto the metal ring at the bottom of the mast 2 7 Unwrap the sail and place the hook on the end of the boom through the metal ring in the clew of the sail 2 8 Pull the length of outh...

Страница 8: ...pulley on the boom back to front and then the main pulley on the boat front to back Finally feed the pulley through the cleat on the mainsheet block 2 10 Tie a couple of figure eight knots in the main...

Страница 9: ...he jib is all the way up and the luff front edge is taut To secure the halyard pass it through the cleat on the mast as shown To keep the line tidy tuck the loose halyard into the pocket hidden behind...

Страница 10: ...10 3 5 Pass the jib sheets through the cleats on the sides of the boat as shown 3 6 A Fisherman s bend can be used to join the two ends of the jib sheets together 3 Rigging the Jib continued...

Страница 11: ...the pins on the back of the boat and the rudder to attach It will be reasonably stiff from new so rotating the rudder while applying a gentle downward pressure can help 4 3 The rudder on the Topaz can...

Страница 12: ...ational Ltd Kingsnorth Technology Park Wotton Road Ashford Kent TN23 6LN Tel 01233 629186 Fax 01233 645897 email info toppersailboats com TOPAZ UNO RIGGING INSTRUCTIONS PART No ISSUE 1 2016 www topper...

Отзывы: