55.The sketch map when the PVC sheet glue up.
58.The sketch map when after the position hollowed
56. Seal the PVC tube to the EDF and assemble them to
the air intake.
59.The sketch map after the ESC and battery
installation.
57. Mark out the position in the air intake and fuselage
where there need to be hollowed.
60.Prepare the parts for assemble the stab.
第 14 页,共 17 页