16
Operating
manual
BTW 6/12 V
Translation of the original
instructions
ALTERNATOR TEST
Testing the battery charging system.
Do not switch off the engine during
the load test.
Share the battery test report
At any time during a test,
touch to access the sha-
ring window.
The results of the test can
then be shared by email:
- as a screenshot.
- in text format.
You can share all test reports by selecting
«Setting» and then «Share Report».
Содержание BTW 12 V
Страница 34: ...34 BTW 6 12 V CCA 4 5 16 40 80 C 40 170 F IP65...
Страница 35: ...RU 35 BTW 6 12 V QR Bluetooth KonNwei...
Страница 36: ...36 BTW 6 12 V 4 5 2 3 4 1 1 2 AGM AGM GEL 3...
Страница 37: ...RU 37 BTW 6 12 V 4 CCA 10 2000 5 TEST...
Страница 38: ...38 BTW 6 12 V 4 1 2 CCA 3 4 1 4 2 3...
Страница 39: ...RU 39 BTW 6 12 V...
Страница 40: ...40 BTW 6 12 V...
Страница 41: ...RU 41 BTW 6 12 V 2...