background image

Operator’s instruction 

 
Preparations before operation 
Check following matters before operation.   

 

Compressor 

Capacity of the compressor is sufficient.

 

Minimum requirement 25hp, 80CFM at 90psig (6.2bar) 

Whether the drain has been removed.   

 

Air Hose 

Whether there is any damage to the air hose. Whether the size and length is correct. 
Clean the interior of the air hose using compressed air.   
When using two or more tools, all except leader hose should  be 1” or large.   
(See diagram above for piping and fittings.) 

 

Inspection of the Air Breaker 

Whether there is looseness in the screw thread areas. 
Whether there is a crack or breakage in the main body. 

 

Inspection of chisel 

Whether the chisel is suitable for the shank of the Air Breaker.   
Whether the chisel is suitable for the work.   
Whether there is wear or cracks.   
Whether the chisel is mounted correctly.   

 

Wearing protective equipment 

Whether the helmet, protective goggles, ear protection, gloves and working shoes are worn correctly.   

 

Air Supply 

Whether the air pressure is suitable. For best operation, supply tool with 90psig (6.2bar) of clean, dry air. 
Higher pressure drastically reduces tool life and can void warranty. (600kPa for max) 

 

Lubrication 

To flush out GUM and DIRT - you should do the following two steps EACH DAY. 
1. (Before the shift), pour a liberal quantity of gum solvent oil into the tool’s air inlet. 
2. Connect tool to air line and operate. Repeat this procedure before storing the tool. 
Air line lubricator should be used in conjunction with the integral oiler. 
Repeat this procedure before storing the tool. 
Whether the oil is suitable for the Air Breaker. (turbine oil equivalent to ISO VG46) 
Whether lubrication has been performed. (at least twice day) 
The importance of adequate and continuous lubrication cannot be overemphasized. 
A few minutes operation without oil may severely damage the valve parts, cylinder and piston. 

 
 
 
 

 

Содержание TPB-90

Страница 1: ...CARD GIVE TO USER Do not use an Air Breaker until this safety instruction has been read and understood completely This manual is necessary to help you to use the Air Breaker correctly WARNING Do not u...

Страница 2: ...any modifications concerning the air tool The manufacturer will not assume any responsibility concerning an accident resulting in injury death or any trouble from an air tool due to the reconstructio...

Страница 3: ...and telephone cable water and drain pipe etc inspect for hidden cable or pipe underground before operating an air tool In case the chisel hits something during operation stop the air tool immediately...

Страница 4: ...rectly Wearing protective equipment Whether the helmet protective goggles ear protection gloves and working shoes are worn correctly Air Supply Whether the air pressure is suitable For best operation...

Страница 5: ...inlet operate the Air Breaker for about 5 seconds after completing work Repeat above operation 2 3 times before storing the Air Breaker Put a cap on the air inlet of the Air Breaker to prevent any du...

Страница 6: ...TPB 90 Parts List Exploded View 7th edition 6...

Страница 7: ...T1 8 X 21 410271531 1 Front Head X 22 130505048 1 Polyurethane Rubber Ball 3 4 A 23 131501018 4 Back Head Bolt X 24 131301116 4 Spring Washer M16 X 25 410241510 4 Back Head Bolt Nut X 26 410271591 1 T...

Страница 8: ...Location of Serial number Year of manufacture and Name plate 8...

Отзывы: