INSTALLATION MANUAL
IP DOOR STATION BOARD
N-8640SB
CAUTION
Use the specified AC adapter in combination.
Failure to do so may cause a fire.
1. GENERAL DESCRIPTION
The N-8640SB is an IP door station assembly kit consisting
of Main and Sub PC boards, cables, and mounting hardware
(excluding the operation panel) of the N-8640DS IP door station.
You can make the IP door station suitable for applications using
this kit in combination with the operation panel section to be
prepared separately.
Use the N-8000 Setting Software* to perform settings. Set up the
same items as those for the N-8640DS since the N-8640SB is
handled as the N-8640DS on the software.
Settings and operations are the same as those of the N-8640DS.
For details, read the descriptions about the N-8640DS in the
N-8000 series instruction manual*.
* Available for download on the TOA product data download site
(http://www.toa-products.com/international/).
2. COMPONENT PARTS
3. OPERATION PANEL DESIGN GUIDELINE
Note: The operation panel should be metallic, and grounded.
[Chassis and case mounting sleeve layout]
Speaker mounting position
Microphone
mounting position
A
B
B
B
B
B
67
33.5
40
20
21
10.5
B
A
41
39.5
40
49
80
21
8
19
39.5
A
A
A
A
A
A
Switch position range
Microphone diameter
φ4.5
Speaker diameter
φ37.5
Unit: mm
• A: Case mounting sleeve position
• B: Chassis mounting sleeve position
• Sleeve height: 11 mm (from the panel’s rear surface)
• Sleeves should be metallic.
• Speaker opening size should be roughly 30% of the area of a
circle with the speaker’s diameter.
• Microphone opening size should be roughly 70% or more of the
area of a circle with the microphone’s diameter.
[Notes on the Call switch]
• Position the Call switch within the range shown above.
• The Call switch’s height should be 20 mm or less from the op-
eration panel’s rear surface.
• The Call switch should be of momentary type.
• When the above conditions could not be satisfied, provide an
external call switch using the external control input cables.
Main PC board ... 1
Case … 1
Sleeve … 3
Call switch connection
harness … 1
LAN connection cable … 1
Machine screw M3 x 8
(with plain and spring washers) … 17
Tapping screw 3 x 8 … 1
Power supply and external
input/output connection cable … 1
Cord bush … 2
LAN coupler … 1
Cord bush fixing bracket … 1
Case gasket … 1
Speaker bracket … 1
Sub PC board … 1
Chassis (with speaker
and microphone) … 1
133-06-304-6C
Be sure to ground the operation panel.
Follow the instructions below.
Doing otherwise may cause unit failure.
• The operation panel should be metallic.
• Install a frame ground terminal and ground the operation
panel. For details, refer to p. 4,
"
5. CONNECTIONS
"
.