TNZ TT 350 mig/mag Скачать руководство пользователя страница 6

Using a suitable regulator, ensure that alternate current 10A flows through the    
created circuit.     

        

 measure a voltage drop between “the outside protective-conductor terminal”    

            and various parts of the cover where danger voltage may occur. Value of this    
            voltage must not exceed 2.6 V.    
 
All found defects must be removed before putting into operation again!!  
 
 

3.10. Regular revisions

 

 

The source is subject to regular revisions according to ČSN 33 1500, ČSN 05 0630 
and ČSN EN 60 974-1. 
The  revisions  are  carried  out  by  workers  with  a  corresponding  electro-technical 
qualification and a report on revision (see ČSN 33 1500) must be issued.  
ATTENTION:  If  the  source  does  not  meet  some  of  next  given  points  in  safety 
respect, it is necessary to put it out of operation immediately.  
 
a)  Inspection 
Mask  off  the  source  after  disconnection  of  the  power  by  unplugging  the  power 
supply.  Carry  out  a  visual  inspection  to  see  whether  the  electric  parts  are  not 
damaged  (selector  switches,  connectors,  terminal  box,  el.  supplies,  bushings  etc.). 
Carry out the control of screw and slip connections, their possible tightening or repair. 
Control  visually  whether  the  mechanical  parts  are  not  released  or  the  safe  air 
distances and surface ways are not disturbed. 

Possible defects must be removed 

prior to further use.  

 
b)  Control of the guard wire  
The guard wire must not be damaged or interrupted. Test the strength of individual 
interconnections on the connections and connectors by hand. 
Continuity of the guard circuit is checked with the power supply of minimally 10A from 
the source PELV and for the period of 1 s. Checking is carried out between clamp PE 
and  various  points,  which  are  components of  the  guard  circuit.  The  guard  circuit  is 
regarded as a compact if the voltage drop is up to 2.6V at the test current 10A. 
 
 
c) Insulation resistance 
Insulation resistance is measured with the voltage 500V ss. Its value according to EN 
60 974-1 must not be lower than: 
Input clamps (primary) – output clamps (secondary)   

 

5 Mohm 

Input clamps (primary) – frame    

 

 

 

 

2.5 Mohm 

Output clamps (secondary) - frame 

 

 

 

 

2.5 Mohm 

Control circuit (secondary transformers for power supply  
of the control circuit) - frame 

 

 

 

 

 

2.5 Mohm 

 
d) Open-circuit voltage 
Voltage measured on the output clamps of the machine must be in tolerance 

±

10% to 

the value given on the machine label.  
 

Содержание TT 350 mig/mag

Страница 1: ...ating instructions of the welding inverter TT 350 mig mag Content 1 Description 2 Technical data 3 Safety regulations 4 Thermal and short circuit protection 5 Putting into operation 6 Maintenance 7 Disposal ...

Страница 2: ... standard On the front panel there are quick plugs for connection of the welding cables a euro terminal for connection of the welding torch for setting of the optimal welding parameters for the individual welding technologies two digital measuring devices and three LEDs The source cooling is forced with a ventilator 1 2 Controls Positions and names of the individual controls are given in the pictu...

Страница 3: ... determined for 25o C X D determines the time during which the source can be loaded by the given welding current without the thermal protection making any reactions This time refers to 10 minute working cycle 3 Safety regulations 3 1 Introduction The source is made in accordance with the present technical knowledge and safety requirements Nevertheless there is a danger of health or life hazard of ...

Страница 4: ...ks resulting from the action of harmful vapours and gases The smoke and harmful vapours occurring during the welding are deleterious It is necessary to exhaust them using suitable equipment and at the same time it is necessary to ensure sufficient supply of fresh air 3 5 Risks resulting from flying off sparks It is necessary to remove all flammable objects from the source working area Volatile fla...

Страница 5: ...immediate removal of failures and defects reported by the source operator to ensure regular inspections of the source to ensure regular revisions of the source in terms of ČSN 33 1500 and ČSN EN 05 0630 3 9 Regular inspections The aim of the inspection is to ensure failure free operation of the source The inspection term is given with regard to frequency of use and environment in which the source ...

Страница 6: ... slip connections their possible tightening or repair Control visually whether the mechanical parts are not released or the safe air distances and surface ways are not disturbed Possible defects must be removed prior to further use b Control of the guard wire The guard wire must not be damaged or interrupted Test the strength of individual interconnections on the connections and connectors by hand...

Страница 7: ...low it to cool down The thermal protection automatically restores the source function after cooling down and the yellow indicator TEMP is off ATTENTION After the thermal protection effect put the electrode holder on insulated place so that accidental short circuit could not occur after restoring of the source function and thus a possible accident or damage to property could not occur 4 2 Short cir...

Страница 8: ...ldment as near to the welded place as possible 5 1 3 Source connection to supply mains The source is constructed for connection to 5 conductor main TN C S with voltage 3x400V 50Hz see point 2 Installation of the main plug for the source connection and its protection must correspond to the valid standards and electro technical regulations 5 2 Welding process MMA connect the source to the supply mai...

Страница 9: ...s MIG MAG switch over the switch 20 into the position 0 disconnect the source from the supply mains by pulling out the fork of the supply 5 3 1 Assembly of the gas bottle Important only a gas bottle with height max 120 cm can be fixed to the source put the bottle on the platform 25 put the bottle into the strap 19 and secure with a chain unscrew the protective cover of the gas bottle remove the se...

Страница 10: ... of the pulley mechanism into the leading tube of the torch in length ca 5 cm check whether the wire locked into the grooves in the feeding pulleys when pressing the levers with the pressing pulleys tip over the tension device into a vertical position adjust the pressure using a screw shackle so that the wire electrode could not be deformed and good feeding could be ensured at the same time put a ...

Страница 11: ...ertical position 5 3 6 Preparation of the source for welding setting of the welding parameters The source is prepared according to points 5 3 1 to 5 3 5 connect the ground welding cable into the plug 13 and connect to weldment switch over the power switch of the source 20 into the position I check the position of the switch 9 MIG MAG the switch 14 2T press the button 5 segment at m min setting of ...

Страница 12: ...ch button after the set time the process finishes automatically the process is repeated by releasing and new pressing of the torch button The switch of the potentiometer 11 must be switched off position 0 for use of the continuous mode of the welding 5 3 10 Process of cyclic welding It is switched on and set with the potentiometer 11 and 12 set the time of the arc burning with the potentiometer 11...

Страница 13: ...pressing of the button 4 PROG 5 3 13 Accessing the welding parameters MIG MAG from memory switch over the switch of the welding procedures 9 into the position PROG MIG briefly press the button 4 PROG Pxx is displayed on the lower display list the number of the program whose parameters we want to weld using the button 5 wait for short time until the parameters are displayed start welding 5 4 Weldin...

Страница 14: ...le from the plug 6 1 Everyday control This activity is carried out by the source operator It is checked state of the main cable state of the welding cables and torch cleanness of the source 6 2 Regular special inspections The control is made by a worker determined by the source owner for this activity The worker must have a corresponding electro technical qualification When inspecting the worker f...

Отзывы: