W W W . T M G I N D U S T R I A L . C O M                     P 1 4 / 2 0                 T o l l   F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

 

Step 7 : Install front and rear cover panel 
 

 

The door cover must be zipped. Use rope (#24) to lift up the front cover (#23) 

from the center grommet and tie it firm to the truss tube and spread toward 
both sides through each grommet along the tube. Refer to Figure 9 and 10 on 
how to attach the rope and tie to the tube.   
 

 

Insert the dropping tube (#15) into the bottom groove pocket on the door 

cover. Tie two ropes (#20) separately on both sides of the peak arch tube. Pull 
both ropes under through the bottom of the door cover from the back, then go 
up from front and through both pulley (#11A) and (#11B) (figure 9). 

 

 

Parts used in this step : 

 
-    (1x2) Door dropping tube (#15) 
-    (2x2) Nylon rope (#20) 
-    (1x2) Front and rear cover panel (#23) 
-    (1) Braided rope (#24) 

 

 

 

(Figure 9 - view from inside) 

 
 
 
 
 

Содержание TMG-ST3060V-1.0

Страница 1: ...W W W T M G I N D U S T R I A L C O M P 0 2 0 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Main Specifications Overall assembled size L18 x W9 15 x H4 57 m 59 x30 x...

Страница 2: ...ing parts We are not responsible for any damages or injuries caused by inappropriate installation unauthorized modifications or extreme weather This building is not intended for human occupancy It is...

Страница 3: ...rafter tube front and rear truss 58xL2866mm 4 3 Lower rafter tube middle truss 58xL2800mm 22 3A Lower rafter tube front and rear truss 58xL2800mm 4 4 Roof purlin horizontal tube 42xL1440mm 60 4A Midd...

Страница 4: ...rame upper tube front and rear truss 58xL1800mm 4 10 Door frame middle tube front and rear truss 42xL2090mm 4 11 Ceiling cross bar 42xL2480mm 13 11A Two wheel rope pulley Pre installed on 2A W35xL130m...

Страница 5: ...86 17 Half round head bolt M8x60mm M8x60mm 120 18 Half round head bolt M8x70mm M8x70mm 172 19 Hex bolt M10x30mm M10x30mm 34 19A Hex bolt M10x50mm M10x50mm 8 20 Nylon rope 8x12m 4 21 Water plug 32mm 16...

Страница 6: ...line showing the positions of base plates front and rear doors All lines should be drawn from center to center of all baseplate tubes Baseplates all baseplates must be installed firmly with expansion...

Страница 7: ...s 1 rear truss 13 rd truss and 11 middle trusses The front and rear trusses are installed with the fabric panel 23 Both front and rear truss include the following parts Connect all tubes with bolt 18...

Страница 8: ...7 7 6 1 2 8 1 9 The 11 middle trusses include the following parts Connect all tubes with bolt 18 refer to figure 3 1x11 Peak arch tube 1 2x11 Upper rafter tube 2 2x11 Lower rafter tube 3 1x11 Ceiling...

Страница 9: ...n all 13 trusses on the ground as Figure 4 when the assembly is all completed and before moving to next step and then wrap 26 around the sharp points of the joint to avoid friction between the fabric...

Страница 10: ...to lift the trusses but you have to make sure it is safe and have enough man power We recommend 3 to 5 people to pull the truss up from different directions When the truss is up tie the ropes to the...

Страница 11: ...er to Step 3 to put up the rest trusses connect all purlins 4 with bolt 17 and secure all bolts firmly on each span before going to next truss figure 6 Parts used in this step 60 Roof purlin 4 110 Mid...

Страница 12: ...W W W T M G I N D U S T R I A L C O M P 1 1 2 0 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 Figure 6 2...

Страница 13: ...2 8 1 9 Step 5 Install the diagonal bracing bars 13 Connect diagonal bracing bar 13 on the first and last span to lower rafter tube 3A and 3 with tube clamp 13A use bolt 19A figure 7 Parts used in thi...

Страница 14: ...he front and rear trusses figure 8 Install rope pulley 11A on the right 11B on the left as shown Parts used in this step 2x2 Door frame lower tube 8 2x2 Door frame upper tube 9 2x2 Door frame middle t...

Страница 15: ...ong the tube Refer to Figure 9 and 10 on how to attach the rope and tie to the tube Insert the dropping tube 15 into the bottom groove pocket on the door cover Tie two ropes 20 separately on both side...

Страница 16: ...st go through the upper wheel of pulley 11A then pull both ropes together slowly and start to lift the door cover Tie both ropes to the corner baseplate Now the door cover is up When you drop down the...

Страница 17: ...ot install the cover during windy weather Unpack the top cover and place it along one of the long sides of the structure Use 3 to 5 ropes 24 to pull the top cover 22 the top of the structure 2 or 3 pe...

Страница 18: ...retched and tied to the front and rear truss by rope going through the flap grommets on the cover Start from the top center and go toward both side on each end Add or cut the rope as needed Pull and s...

Страница 19: ...the cover on the structure from both sides figure 13 Insert tension tubes 14 slowly into the bottom groove pocket on both long sides Add the water plug 21 on the first tension tube to avoid tearing th...

Страница 20: ...right back and forth to make sure it is square and centered Cut the groove pocket where it aligns with ratchet 7A and use tension band 25 to pull tension tube 14 to ward the ratchet and secure it Eve...

Страница 21: ...g on the fabric cover must be removed as soon as possible If snow becomes solid ice on the cover it will increase the weight on the roof and may collapse the shelter or reduce the life span Keep the s...