▶
W W W . T M G I N D U S T R I A L . C O M P 3 1 / 3 1 T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
After the Installation
Walk around and inspect the building periodically to make sure all
components are still firmly secured and the whole building is well
supported. Check all bolts and nuts as well as all connection points to make
sure they are all in good position. Check the base plates, adjust the ropes
and tie downs if required and clean the cover regularly.
Snow accumulating on the fabric cover must be removed as soon as possible.
If snow becomes solid ice on the cover, it will increase the weight on the
roof and collapses the building or reduce the life span eventually.
Keep the building on a dry ground most of the time. Do not keep the fabric
dirt skirt under water all the time, otherwise the fabric will deteriorate.
We strongly recommend you remove any snow from the roof immediately.
Do not leave any snow load on the roof overnight. Keep 3 feet of clearance on
all sides at all times. Do not allow snow to accumulate and pile up on the sides
of the building. Otherwise the push from the sides toward inside will make the
building collapsed at some point.