background image

W W W . T M G I N D U S T R I A L . C O M

P 1 / 14

T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

Main Specifications :

Overall assembled size : W6 x L9 x H3.78 (m) / 20 x 30 x 12 (ft)

Width : 6 m / 20ft

Length : 9 m / 30 ft

Ridge peak height : 3.78 m / 12 ft

Shoulder wall clearance height : 3.0 m / 10 ft

Prior to assembly

Please read the instructions carefully before installation. It is very important to follow

your local safety regulations and industry standards during installation. Regulations may

include but are not limited to:

-

Safety helmets, protective eyewear, and clothing

-

Safety harnesses for all elevated workers

-

Proper ladder, cage, and safety operation

Check all components and parts before installation. All parts are marked with a part

number, please refer to the parts list to make sure you have all parts.

Choose a day with low or no wind to install, assembly is hard in heavy wind. Do not make any

alterations to the structure. Do not hang any weights on the frame during installation, including

parts. We are not responsible for any damages or injuries caused by inappropriate installation,

unauthorized modifications or extreme weather.

This building is not intended for human occupancy.

It is recommended to tape or add foam/rubber on the frame where joints connect and where it

touches the cover. This will help extend the life span of the cover.

Read the following item list carefully and count the number of items to ensure that all

parts are included prior to setup.

Содержание TMG-CP2030F-1.0

Страница 1: ...W W W T M G I N D U S T R I A L C O M P 0 14 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9...

Страница 2: ...ation Check all components and parts before installation All parts are marked with a part number please refer to the parts list to make sure you have all parts Choose a day with low or no wind to inst...

Страница 3: ...lder tube 12 1 1 3A Shoulder tube middle 2 1 1 4 Sidewall tube 14 1 1 4A Short casing 55 1 1 5C Top cross bar A 5 1 1 5D Top cross bar B 1 1 1 6 Ceiling cross bar 7 1 1 6A Foot tube front and rear 4 1...

Страница 4: ...l cable mounting plate 4 1 1 13 Anchor hook M14x120mm 6 1 1 14 Steel cable 3 9m 6 1 1 15 Expansion bolt 16x150mm 14 1 1 16 Waterproof silicon sealant 5 1 1 16A Teroson statu 1 1 1 17 Hex bolt M10x70mm...

Страница 5: ...d for positioning all dimension lines are drawn from the center of the pipe to the center and the diagonal X must be equal to Y Installation of foundation pipes all foundation pipes shall be connected...

Страница 6: ...rear truss in this step refer to figure 2 1x2 Peak arch tube 1 2x2 Middle rafter tube 2 2x2 Shoulder tube 3 2x2 Sidewall tube 4 2x2 Steel cable mounting plate 12 34x2 Hex bolt 17 1x2 Ceiling cross bar...

Страница 7: ...2 Reinforced tube mounting plate 6E 6 Short casing 4A Figure 3 Parts used to install 5 middle trusses in this step refer to figure 4 1x4 Peak arch tube 1 2x4 Middle rafter tube 2 2x4 Shoulder tube 3 2...

Страница 8: ...the assembly is all completed and before moving to next step refer to figure 5 Figure 5 Step 3 Assemble all trusses to the foundation pipe and connect them with 17 bolts The front and rear trusses ar...

Страница 9: ...r e e 1 8 7 7 7 6 1 2 8 1 9 Figure 6 Install top cross bar A 5C and top cross bar B 5D Use 21 and 17 Hexagonal bolt fixation refer to figure 7 Parts used in this step 5 Top cross bar A 5C 1 Top cross...

Страница 10: ...eel tiles must be aligned with the midpoint of the top arch tube you can mark the center of the top arch tube with a line The extension size of both ends is 50mm The size of the middle cross overlap p...

Страница 11: ...7 7 7 6 1 2 8 1 9 Figure 8 Install the first color steel tile Take the first colored steel tile at the top as the benchmark ensure that both ends of each colored steel tile are aligned and lock it on...

Страница 12: ...ing strips Start to install the color steel tile edge protector 9A from one side and align one end with the color steel tile edge The opening of the edge banding strip of the color steel tile shall be...

Страница 13: ...e 11 Install the edge buckle 10 and the two raised card points of the edge buckle are aligned with the square holes at the interfaces of the two color steel tile edge bands and then press the buckle i...

Страница 14: ...and waterproof plug Select a suitable position to fix the expansion bolt of the draw hook on the ground hook one end of the wire rope onto the wire rope mounting plate and eyebolt and fix the other e...

Страница 15: ...cally to make sure all components are still firmly secured and the whole shelter is well supported Check all bolts and nuts as well as all connection points to make sure they are all in good position...

Отзывы: