Page
7
of
9
Figure 5
Step 5 : Install the diagonal bracing bars (#6) on the 1
st
span
Connect diagonal bracing bar (#6) with tube clamp (#9) and bolt (#13) on the
first span as Figure 6 below.
Parts used in this step :
-
(4) Tube clamps (#9)
-
(2) Diagonal bracing bar (#6)
-
(2) Hex bolt (#13)
Figure 6
Содержание TMG-203012PST
Страница 1: ...Page 0 of 9...