10. CUSTOMERS’ REPORT
10.1 Delivery and Installation Card
This is report is for checking that Post driver hammer is correctly
delivered and equipped on machine Distributor should correctly
draw up this. This is report must be drawn up in typewritten
and Informed within 7 days after the date When delivered Post
driver hammer to customer.
■ Machine
●
Maker / Model : Manufacturer and model name of the carrier
●
Operating Weight
●
Operating Hours : Actual operating hours at time or Date
delivered out Post driver hammer
●
Oil Filter – If there is mark “Y” , if not mark “N”
If there is not it or it’s condition is bad, Post driver hammer should be troubled easily.
Therefore please recommend customer to install it in change new one.
●
Others : Performance or Condition of Engine and Hydraulic pump.
■ Post driver hammer
●
Model & Serial No : Model name and Serial No. of the Post driver hammer
●
Operating Pressure : Actual operating pressure
●
Relief set Pressure : Actual relief valve setting pressure for Post driver hammer
●
Operating Oil Flow : Actual required operating flow
●
Gas Pressure : Actual pressure in accumulator or gas chamber
WWW.TMGINDUSTRIAL.COM
P20/23
Toll Free:1-877-761-2819