TJERNLUND VP-2, VP-3 8500567 0702 Скачать руководство пользователя страница 11

3. Following the water heater manufacturer’s instructions, place the appliance in operation, set thermostat for continuous operation.

4. Allow fans and appliance to operate for 5 minutes.

5. Tripping of the Linear LImit spillage sensing switch during the 5 minutes indicates an unsafe operating condition. Turn off fuel supply 

to appliance and 

DO NOT OPERATE UNTIL UNSAFE VENTING CONDITION IS INVESTIGATED BY PROFESSIONAL

CONTRACTOR OR UTILITY SERVICE PERSONNEL.

6. Return all windows, doors and fans to their previous conditions of use.

7. Sign and date these instructions to verify that the

Sign:                                                      

combustion air and safety interlock test have been
completed. These instructions must remain on 

Date:                                                     

premises.

PERFORMANCE CURVES

10

VP-2 PERFORMANCE CURVE

VP-3 PERFORMANCE CURVE

Содержание VP-2, VP-3 8500567 0702

Страница 1: ...Solenoid Valve to be installed in 1 2 burner gas line from water heater gas valve to burner eliminating pilot outages caused by power interruptions OWNERS INSTRUCTIONS THESE INSTRUCTIONS MUST REMAIN W...

Страница 2: ...T OF PILOT OUTAGE 1 Push the reset button in the center of the linear limit spillage sensing located on the draft hood on the top of the water heater 2 Turn the gas pilot knob at the top of water heat...

Страница 3: ...The Power Venter must not be installed into any portion of a vent system which serves appliances other than the one s vented by the VP 2 or VP 3 SEQUENCE OF OPERATION 1 Water heater thermostat calls...

Страница 4: ...pment damage 9 Make certain the power source is adequate for the fan motor requirements Do not add the Power Venter to a circuit where the total load is unknown 10 The installer must verify that the B...

Страница 5: ...switch Make sure each end of the tubing is not pinched closed 5 Measure and cut an appropriate length of tubing to reach from the fitting marked warning to the burner of the water heater Connect tubi...

Страница 6: ...y from or 1 foot above any door window or gravity air inlet into any building At least 12 inches above grade So that the flue gases are not directed so as to jeopardize people overheat combustible str...

Страница 7: ...ce INSTALLATION RESTRICTIONS 1 Power Venter should be installed as close to the termination of the vent system as possible to prevent flue gas leakage 2 Power Venter must be installed with the motor s...

Страница 8: ...ling joists taking care not to come closer than 6 to the vent pipe or any other potentially hot surface In most cases the gas supply line may be used as a routing path from the ceiling to the water he...

Страница 9: ...ION CIRCUIT CHECK 1 Place water heater in operation A The Power Venter should operate 2 Turn gas pilot knob to pilot B The Power Venter should continue to operate for approximately 45 seconds to purge...

Страница 10: ...iately VP 2 VP 3 WATER HEATER VENT PACKAGE LADDER WIRING DIAGRAM COMBUSTION AIR TEST WARNING The linear limit spillage sensing switch is designed to alert the user to a potentially hazardous condition...

Страница 11: ...rating condition Turn off fuel supply to appliance and DO NOT OPERATE UNTIL UNSAFE VENTING CONDITION IS INVESTIGATED BY PROFESSIONAL CONTRACTOR OR UTILITY SERVICE PERSONNEL 6 Return all windows doors...

Страница 12: ...stance contact the Tjernlund Products Inc Technical Customer Service Department at 1 800 255 4208 7 30 4 30 CST NOTE If the pilot light is extinguished follow the steps under IN THE EVENT OF A PILOT O...

Страница 13: ...he Tjernlund Products Inc Technical Customer Service Department at 1 800 255 4208 7 30 4 30 CST NOTE If the pilot light is extinguished follow the steps under IN THE EVENT OF A PILOT OUTAGE on page 1...

Страница 14: ...o determine faulty component contact your Tjernlund distributor or Tjernlund Products Technical Customer Service Department at 1 800 255 4208 for troubleshooting assistance 2 After the faulty componen...

Страница 15: ...drill bit must be long enough to penetrate to the building exterior 3 Attach the template to the building exterior aligning the pilot holes on the template with the pilot holes drilled in step 2 4 Usi...

Отзывы: