Titan Attachments 177CBUCKET Скачать руководство пользователя страница 6

 

TO OPERATE THE IMPLEMENT 

1.

 

Turn on the skid steer 

2.

 

Properly adjust the direction and angle of the bucket for loading. 

a.

 

The bucket should be set on the ground. 

b.

 

The bucket’s bottom should be parallel with the ground. 

3.

 

Load the concrete material into the bucket. 

a.

 

Make sure to gradually add water to the mixture during the loading phase. 

b.

 

Do not overfill the bucket. A good marker for a fully loaded bucket is an 
approximately 2” auger blade showing outside of the concrete mixture. 

4.

 

Once the material is fully loaded, the implement should be lifted from the ground. 

5.

 

After lifting the implement, the auger should be turned on and the RPMs of the 
auger should be increased to no more than 50% of maximum speed. 

TO UNLOAD THE BUCKET 

1.

 

The user may use the side discharge chute. 

a.

 

To use the side discharge chute, the discharge chute must be hooked onto 
the implement near the bearing block. 

2.

 

The auger must also be put in reverse to expel the material. 

a.

 

When the discharge chute is in place, the handle must be pulled to open 
the chute and release the material.  

Содержание 177CBUCKET

Страница 1: ...OWNER S MANUAL MPN s 177CBUCKET SKU s 191505 UPC s 84000920570...

Страница 2: ...s or failures in the implement o Ensure that the machine is mounted properly on skid steer o Safety clothing protective glasses and mask should be worn during operation to prevent injury from splash c...

Страница 3: ...3 PRODUCT STRUCTURE IMPORTANT PARTS OF STRUCTURE 1 Gear Cover 2 Hydraulic Hoses 3 Motor 4 Bucket 5 Auger 6 Screen 7 Bearing Seat 8 Discharge Chute...

Страница 4: ...4 TECHNICAL PERFORMANCE...

Страница 5: ...MPLEMENT TO THE SKID STEER 1 Slowly drive the skid steer forward 2 Attach the hoses to the skid steer and bucket a NOTE A CASE DRAIN PORT IS REQUIRED FOR THIS IMPLEMENT 3 Connect the skid steer s moun...

Страница 6: ...2 auger blade showing outside of the concrete mixture 4 Once the material is fully loaded the implement should be lifted from the ground 5 After lifting the implement the auger should be turned on an...

Страница 7: ...7 1 The user may also use the front of the bucket by lifting the screen up and lowering the bucket...

Страница 8: ...8 TO FINISH OPERATING THE BUCKET 1 Turn off the skid steer 2 Clean any debris or left over material inside or on the bucket...

Страница 9: ...s issues arise a Check all bolts nuts and screws Tighten any loose bolts nuts and screws 4 Ensure all hydraulic fittings are properly connected and tight 5 Grease the implement at both grease points a...

Страница 10: ...ved like the Grease Point 2 maintenance STORAGE INSTRUCTIONS 1 To store we recommend placing equipment on wooden platform and not directly on ground 2 Store in a dry and safe place Buckets exposed to...

Страница 11: ...11 PARTS DIAGRAM EXPLODED VIEW PARTS DIAGRAM 1 CONCRETE MIXER BUCKET ASSEMBLY...

Страница 12: ...12 PARTS DIAGRAM 2 AUGER ASSEMBLY...

Страница 13: ...13 PARTS DIAGRAM 3 DISCHARGE CHUTE ASSEMBLY...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...16...

Страница 17: ...17...

Страница 18: ...itan its insurers employees officers directors associates and agents from any and all claims demands damages rights of action or causes of action present or future whether the same be known or unknown...

Отзывы: