background image

9

 

1.3.2 

Turnstile scope of delivery

 (standard)

:

 

 

Tripod turnstile

 

 

 

Control panel

 

 

 

Anchors

 

(4 

pcs

.)

 

 

Data sheet

 

 

 

Battery (capacity 4 Ah)

1

 

For 

 

convenience 

 

of 

 

delivery 

 

the 

 

turnstile 

is 

 

supplied 

 

ready-to-install 

 

with 

dismounted barrier rods

 

(

See Fig

.2).

Fig

.2. – 

Tripod turnstile scope of delivery

 

1.3.3 

The turnstile design, overall and installation dimensions

 

(

See Fig.

3)

 

Fig

. 3 - 

Tripod turnstile dimensions

1

 

Is not included in the turnstile scope of delivery

 - 

to be equipped by the custoner, if appropriate

CENTURION

-

M

 

BASTION

-

M

 

SKULL

-

M

 

*

Carrier sleeve size

TWIX

-

M

 

Turnstile assembly

Hub with barrier rods

Содержание BASTION-M

Страница 1: ...SERVO OPERATED TRIPOD TURNSTILES CENTURION M BASTION M SKULL M TWIX M OPERATION MANUAL 2018 TiSO PRODUCTION LTD...

Страница 2: ...OSAL 39 7 MANUFACTURER S WARRANTY AND TERMS OF WARRANTY MAINTENANCE 39 Annex 41 Annex B Control panel and connection diagram 45 Annex C Wiring diagram of the servo operated tripod type turnstile 47 An...

Страница 3: ...k with electrical facilities with voltage up to 1000 V and scrutinizing this Operation Manual obtaining safety instructions and trained for operation and maintenance of the turnstile Reliability and d...

Страница 4: ...on CENTURION M T3 TCC E AUIA 095 OM BASTION M T3 TCY E AUIA 097 OM SKULL M T3 TCG E AUIA 096 OM TWIX M T3 TYK E AUIA 137 OM Example of reference designation of the servo operated turnstile with solid...

Страница 5: ...to AC network with parameters specified in paragraph 1 2 Specifications inspection adjustment and repair should be performed only after the turnstile is deenergized After purchasing of the turnstile...

Страница 6: ...Ambient air temperature MC4 1 to 40 Relative air humidity Ambient air allowable pressure Transportation temperature range Storage temperature range Group of mechanical application L3 Altitude above se...

Страница 7: ...st 10 years 1 2 Specifications The key parameters of the turnstile are specified in Table 4 Table 4 Parameter description Unit measure Parameter value Minimum traffic flow capacity in free access mode...

Страница 8: ...l reference designation T3 TCC SE carbon steel painted in any colour according to RAL reference designation T3 TCC E The turnstile basic modification is made of brushed stainless steel CENTURION M BAS...

Страница 9: ...stall with dismounted barrier rods See Fig 2 Fig 2 Tripod turnstile scope of delivery 1 3 3 The turnstile design overall and installation dimensions See Fig 3 Fig 3 Tripod turnstile dimensions 1 Is no...

Страница 10: ...positioned horizontally barring the turnstile access 1 4 1 3 The plates on which power supply unit controllers terminal blocks for connection to 220 V network and control panel are mounted are fixed...

Страница 11: ...n is shown in Figure 5 Top view Front view 6 hub shaft 1 gear motor 2 position sensor 7 mechanism body 3 antipanic device 8 hub with barrier rods 9 stop catches 4 locking solenoid 5 driving belt 10 me...

Страница 12: ...the relevant angle is reached they are locked by means of two stop catches of the actuating mechanism The mechanism powerful controllable ratchet system does not allow to return a barrier rod in the...

Страница 13: ...he turnstile scope of delivery extension cord kit of end and pin wrenches kit of hexagons kit of screwdrivers hammer multimeter tester measuring tape marker pliers side cutters builder s level 13 Afte...

Страница 14: ...0 1 7 V Maximum peak voltage applied to inputs IN1 IN8 15 V Peak voltage switched by outputs GRN1 RED1 GRN2 RED2 30 V Peak current switched by outputs GRN1 RED1 GRN2 RED2 2 Peak voltage switched by ou...

Страница 15: ...d into program depending on incoming commands rotor position rotation speed and motor current It provides rotor locking in initial state maintaining rotor rotation speed in access mode as well as moto...

Страница 16: ...X2 9 MOT1 EXIT Motor connection X2 10 MOT2 EXIT X2 11 GND X2 12 24 V ENTRY 3 3 ENTRY EXIT power supply common wire power supply common wire Communication port power supply controller energization 1 0...

Страница 17: ...uts for acquisition of control commands 5 Number of signal outputs 7 Type of inputs logical Type of outputs open collector Logical 1 voltage 3 5 V Logical 0 voltage 0 2 2 V Maximum peak voltage applie...

Страница 18: ...or unlocking in one direction with the possibility of its revolving to 120 It provides access of one pedestrian through the turnstile Fig 10 Appearance of the turnstile controller 112 21 20 00 SINGLE...

Страница 19: ...T1 or OUT2 is removed Delay of WAITING FOR START OF ACCESS is reset When rotor is rotated to 64 ACCESS DETECTION OUT3 or OUT4 signal is generated When rotor is rotated to 120 OCCUPIED ACCESS and ACCES...

Страница 20: ...e to the angle more than 6 the controller is switched to the INITIAL STATE 1 6 2 3 5 PANIC FUNCTION The turnstile is switched to PANIC state After the active state is held on input INP5 PANIC for more...

Страница 21: ...otor reaches the angle 120 1 5 INP5 TO BE OPENED B ENTRY 1 6 GND common power supply common wire 2 1 GND common 2 2 OUT1 START OF ACCESS EXIT Signal is generated by controller when rotor revolves from...

Страница 22: ...3 5 SGN2 ENTRY Selection of turnstile modification 3 6 SGN3 ENTRY Not applicable 3 7 SGN4 ENTRY Not applicable 3 8 INDAR EXIT It is used for the turnstile LED display control 1 Type of output open col...

Страница 23: ...ctor 2 Peak voltage on public key 50 V 3 Peak current of public key 9A 4 Resistance of public key 0 11 Ohm 4 3 MGB EXIT Not applicable 4 2 MGA Not applicable 4 4 MGB Not applicable 5 1 GND common powe...

Страница 24: ...e turnstile when metalwork of the turnstile and its components and accessories are mechanically damaged 2 1 3 List of special operation conditions Mean time of the turnstile access in single access mo...

Страница 25: ...turer s warranty liabilities 2 2 3 Safety Measures Installation to be performed only by the persons briefed on safety and studied this manual Only serviceable tools to be used during installation of t...

Страница 26: ...26 Side view Top view Fig 12 Tripod turnstile layout conditionally ENCLOSURE ENCLOSURE...

Страница 27: ...rding to the turnstile data sheet WARNING When the turnstile damages are detected or in case of shortage of delivery installation work to be stopped and the turnstile supplier to be referred to The tu...

Страница 28: ...28 BASTION M TWIX M SKULL M Fig 13 Tripod type turnstile installation marking...

Страница 29: ...he turnstile mechanism 4 During installation attention to be paid that the mechanism fixation holes to be aligned with the hub holes c The hub 1 to be secured with three screws 3 Fig 14 Installation o...

Страница 30: ...nstalled 5 To be secured with anchors Fig 15 General view of the CENTURION M and BASTION M tripod turnstiles assembly 9 The screws on the turnstile rack lid butt ends to be unscrewed and the lid to be...

Страница 31: ...to be pulled through available service hole in the turnstile rack bottom butt end part by reclining the turnstile Fig 12 Fixation holes at the turnstile bottom plate to be aligned with prepared surfac...

Страница 32: ...ed in the removal reverse sequence WARNING During the turnstile installation it should be taken into account that horizontally positioned barrier rod must be at a distance not more than 50 100 mm from...

Страница 33: ...tions Both FREE buttons to be pushed for access in both directions A and B FREE button to be pushed for access in selected direction A or B Green arrow of authorized free access is lit in selected dir...

Страница 34: ...on during the active panic mode Barrier rod is dropped and access way is cleared when the PANIC button is pushed on control panel and hold for more than 7 seconds or when signal is sent to the relevan...

Страница 35: ...d in instrumentation instruction manuals 3 3 Maintenance procedure 3 3 1 The turnstile maintenance includes preventive measures which are taken according to the established frequency to maintain the t...

Страница 36: ...o perform repair such as lubrication component replacement and adjustment inside the device All such works to be performed only by the qualified technical personnel Fixation screws 6 months Checking T...

Страница 37: ...Table 12 Make sure that ACS provides proper activation signal...

Страница 38: ...38 Continued Table 12 1 2 3 4 3 Postrepair checkout The turnstile performance to be checked after repair according to paragraph 2 3 2 of this OM...

Страница 39: ...ontain materials environmentally hostile and hazardous to human health and special measures are not required for its disposal 7 MANUFACTURER S WARRANTY AND TERMS OF WARRANTY MEAINTENANCE 7 1 The manuf...

Страница 40: ...f Ukraine concluded purchase contracts and these warranty liabilities TiSO PRODUCTION LTD 14 Promyshlennaya str 02088 Kiev Ukraine Tel 38 044 291 21 01 Tel Fax 38 044 291 21 02 E mail trade tiso globa...

Страница 41: ...Annex mandatory Design overall and installation dimensions of the ENTURION M type turnstile Figure 1 Tripod turnstile ENTURION M...

Страница 42: ...42 Continued Annex mandatory Design overall and installation dimensions of the turnstile BASTION M Figure 2 Tripod turnstile BASTION M...

Страница 43: ...43 Continued Annex mandatory Design overall and installation dimensions of the turnstile SKULL M Figure 3 Tripod turnstile SKULL M...

Страница 44: ...44 Continued Annex mandatory Design overall and installation dimensions of the turnstile TWIX M Figure 4 Tripod turnstile TWIX M...

Страница 45: ...rol panel housing 2 SINGLE ACCESS mode control button 3 front plate 4 LOCK mode control button 5 FREE ACCESS mode control button 6 PANIC mode control button 7 access direction LED display 8 controller...

Страница 46: ...46 P G A B Continued Annex B Control panel and connection diagram Figure B 2 Control panel AUIA 114 02 00 00 connection diagram...

Страница 47: ...X3 RX X1 1 10 7 4 1 GND 24V GND MOT1 MG 2 MG 1 MG 1 GRN2 RED 1 X2 12 5V 11 GND 9 GND 8 IN 8 6 IN 6 5 IN 5 3 IN 3 2 IN 2 MOT2 MG 2 RED 2 GRN1 10 GND 7 IN 7 4 IN 4 1 IN 1 3 1 2 GRN XP1 12V RED PCB 121...

Страница 48: ...nd is issued entry is activated for 5 sec inp3 TO BE OPENED B in pulse mode When command is issued entry is activated for 5 sec inp4 TO BE OPENED A Entry is activated for the time of keeping in active...

Страница 49: ...B in pulse mode When command is issued entry is activated for 5 sec inp4 TO BE OPENED A Entry is activated for the time of keeping in active state inp5 TO BE OPENED B Entry is activated for the time o...

Страница 50: ...ntry is activated for 5 sec inp3 TO BE OPENED B in pulse mode When command is issued entry is activated for 5 sec inp4 TO BE OPENED A Entry is activated for the time of keeping in active state inp5 TO...

Страница 51: ...ated for 5 sec inp4 TO BE OPENED A Entry is activated for the time of keeping in active state inp5 TO BE OPENED B Entry is activated for the time of keeping in active state GND of power supply common...

Страница 52: ...52 Annex D 5 mandatory Wiring diagram of the turnstile connection to control panel Figure D 5 Wiring diagram of the turnstile connection to control panel...

Отзывы: