background image

9

One of these two terminals 

marked earth   can be 

used as a neutral terminal.

Fig. 6

 – TGVL01, TGVL02, TGVL03 Earth terminal positions.

Содержание Weathersafe Vision TGV101N

Страница 1: ...I n s t a l l a t i o n O p e r a t i n g I n s t r u c t i o n s Weathersafe Vision...

Страница 2: ...t 13A active non latching TGV103N One gang switched fused spur 13A General Please note that all instructions are to be left with the customer after installation The Weathersafe Vision range is manufac...

Страница 3: ...t person e g qualified electrician in accordance with these instructions and in compliance with the appropriate clauses of the current edition if the IEE wiring and building regulations Sockets should...

Страница 4: ...the lowest point of the conduit The relevant cable entry knock out should be unscrewed A waterproof cable or conduit entry must then be fitted in its place If two cable entry positions are used with m...

Страница 5: ...ee fig 2 Plugs may be inserted into the sockets and the socket switches turned on The lid should then be closed to maintain the IP rating taking care to ensure that the cables are aligned with the cen...

Страница 6: ...blue for TGV205N button marked Reset R the status indicator should show red TEST press the red button marked Test T status indicator should show black This indicates that the RCD has been tripped and...

Страница 7: ...ting the RCD any connected appliance may be switched on and used in the confidence that the user is protected from electric shock by rapid disconnection of supply If the RCD trips Turn the appliance s...

Страница 8: ...s important Remove this product from circuit if carrying out tests as described in the IEE Wiring Regulations for earth loop impedance prospective short circuit current and insulation resistance Use t...

Страница 9: ...t its pivot point Be sure to protect the casing under the screwdriver blade with a piece of card as shown Protect the case with card Concerning TGVL01 TGVL02 TGVL03 only If a local neutral is required...

Страница 10: ...9 One of these two terminals marked earth can be used as a neutral terminal Fig 6 TGVL01 TGVL02 TGVL03 Earth terminal positions...

Страница 11: ...purchase and it will be replaced free of charge For the second and third years or any difficulty in the first year telephone the helpline on 020 8450 0515 Note A proof of purchase is required in all...

Страница 12: ...Limited Victory Park 400 Edgware Road London NW2 6ND Sales Office 020 8452 1112 or email csc timeguard com For a product brochure please contact For assistance with the product please contact or emai...

Отзывы: