![Timeguard NTT08 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/timeguard/ntt08/ntt08_installation-and-operating-instructions-manual_1117359005.webp)
4
5
5. Connection Diagram
• The terminals are marked as follows
on the bottom of the wall plate;
Wiring as marked on the terminals –
Left to right
Live Supply (Brown or Red) to
L
Neutral Supply (Blue or Black) to
N
Neutral Load to immersion heater
(Blue or Black) to
N
Switch Live to immersion heater
(Red or Brown) to
L1
Earth (Green/Yellow) to
Note: this device needs to be left to charge for
a minimum of 15 minutes once powered up,
before it will operate.
L
N N
L1 E
Load
230V 50Hz
Mains Supply
All manuals and user guides at all-guides.com