Installation & Oper
ating Ins
tructions
6.5W LED Energy Saver
Bulkhead Light
Model: LED88N – Black
Страница 1: ...I n s t a l l a t i o n O p e r a t i n g I n s t r u c t i o n s 6 5W LED Energy Saver Bulkhead Light Model LED88N Black...
Страница 2: ...nd install in accordance with the current IEE wiring and Building Regulations Check that the total load on the circuit including when this luminaire is fitted does not exceed the rating of the circuit...
Страница 3: ...ng holes on the wall using the wall plate as a template and drill the holes ensuring not to infringe with any gas water pipes or electrical cables that may be hidden below the surface Insert the wall...
Страница 4: ...Connection Diagram ensuring correct polarity is observed and that all bare conductors are sleeved 4 7 Re connect the luminaire to the wall plate by positioning it on the top first and then push on th...
Страница 5: ...he 230V 50Hz mains supply cable to the terminal block as shown Supply Live Brown or Red to L Supply Neutral Blue or Black to N 1 1 62 7 21 6 7 MAINS SUPPLY Connection Diagram 1 1 62 7 21 6 7 MAINS SUP...
Страница 6: ...g faulty due to defective material or manufacture within 3 years of the date of purchase please return it to your supplier in the first year with proof of purchase and it will be replaced free of char...
Страница 7: ...6...
Страница 8: ...csc timeguard com For a product brochure please contact If you experience problems do not immediately return the unit to the store Telephone the Timeguard Customer Helpline Qualified Customer Support...