Parts Identification
Parts Checklist
Page 1 of 8
RHAPSODY OTTOMAN
LIFT UP BED
180115
PLEASE READ this sheet prior to assembly to familiarise
yourself with the various stages of construction. Carefully
open the pack supplied and check the contents against the
parts and fittings check list.
Do not destroy any of the packaging until you are certain
that you have all the necessary parts for the assembly.
Please ensure that the packaging is disposed of in a safe
environmentally friendly way.
CAUTION: There are small components used in the
construction of this unit. These loose items should be kept
away from young children during assembly, to avoid the
danger of choking.
IMPORTANT: BEFORE STARTING TO ASSEMBLE THE BED - PLEASE READ THESE INSTRUCTIONS CAREFULLY.
6
7
9
1
FABRIC
HANDLE
8
HEADEND
FOOTEND
2
3
4
5
10
6
2
1
7
8
9
Headboard
Footboard
Side Panel - Left
Side Panel - Right
Metal Slat Frame
Angle Brackets
2
Cross Bar
Mattress Stoppers
1
10
1
Slat Frame Support Rail (wood)
Fabric Base Cover
Ref.
Qty
Ref.
Description
5
Qty
1
2
3
1
1
1
Description
4
1
1
An instructional video of the Operation of the Ottoman Lift Up system is available via YouTube using
the following address:
https://youtu.be/hyq4zm7h_yU