![Time Module Cal.VJ12A/B Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/time-module/cal-vj12a-b/cal-vj12a-b_technical-manual-and-parts-catalogue_1117097007.webp)
・
How to install
Put the date dial guard on the main plate so that
the A and B portion are over the guide pins,
as shown in the illustration at right.
Move the protrusion D of the date dial guard in the
counterclockwise direction so that it is caught
under the main plate.
Slightly move the protrusions C and E in the
counterclockwise direction alternately to set
them under the main plate. Then, set the
A and B portions of the date dial guard to
the guide pins.
Check that the date dial guard is fixed
securely to the main plate.
Battery
・
How to install battery
Insert the Battery aslant in the direction shown by the arrow.
Check the Battery connection (+) securely touches the side
face of the Battery.
Correct
Coil block
Battery
Main plate
Battery conn)
Battery connection (+)
・
How to install
Have the hook portions ( 3 places) catch the main plate ( Fig.1 & Fig.2).
In disassembling and reassembling, take care not to deform the hook portion.
After installing the Battery connection (+), check that the three hook portions securely catch the main plate.
Hook portion
Tweezers
Hook portion
Main plate
Hook portion
Version-01
Cal.VJ1*A/B
TECHNICAL GUIDE
3)
6
1)
2)
4)
4
[ Fig.1 ]
[ Fig.2 ]
SII Products
3
Protrusion C
Protrusion D
Protrusion E
A portion
B portion