background image

Page    4

 (

a

)

Installation of Idler Hubs

(

a

) Parts of this document regarding the installation and maintenance of hubs are applicable ONLY if hubs are supplied by Timbren Industries Inc.

(

b

) Use a high temperature automotive type wheel bearing grease. We recommend using Lithium complex type products with NLGI consistency of 2, with additives for

      EP (extreme pressure), corrosion and oxidation, dropping point of 419° F (min.) (or 215° C), with minimum viscosity index of 80.
(

c

) Always use NEW cotter pins (8).  

Typical 5 Bolt Idler Hub Assembly

Fig. 1

Inboard

Outboard

b

( )

Grease  inner and the outer bearings (

(3)&(5))

 . Insert inner bearing in its housing on the inboard side of 

hub 

(4)

 . Insert the grease seal 

(2) 

on top of the bearing and make sure it is fully seated. Turn hub around, 

lift it and place it on the spindle 

(1) 

and slide it over into place.  Insert outer bearing 

(5) 

.  Put washer 

(6)

 and 

install the castle nut 

(7)

 onto spindle. Tighten nut. Gently loosen it approximately 1/8 of a turn.  Insert cotter 

pin 

(8)

 through castle nut and spindle hole and then bend the end around the spindle with a screw driver or 

plyers.  Put the grease cap 

(9) 

and rubber plug 

(10)

 on.  

1

2

4

3

5

6

7

8

9

10

An easy way to estimate a 5 lug bolt circle
is to measure from the center on one hole 
to the BACK of the third hole.

Identifying the bolt pattern of a hub

545 hub 

545 hub = 5 bolts on a 4.5” bolt circle

TIMBREN INDUSTRIES INC. -  1-800-263-3113  -  [email protected]

The bolt circle is the diameter of an imaginary circle 

formed by the center of the wheel hub

Typical Installation

Отзывы: