S
eTTiNG
S
hifT
-p
OiNT
aNd
b
eGiNNiNG
Of
r
eGULaTiON
1. Disconnect and remove the Motor Shift Hose from the track drive motor. Leave the MS port open to breath. See Figure 2
below for MS Hose and port location on motor.
2. Install a 6,000 psi gauge into the MH Test Port. See Figure 1 on next page for MH Test Port location.
3. Run engine at a minimum of 1400rpm.
4. Have operator stroke pump and adjust POR to desired pressure.
5. Remove gauge from the track drive pump MH port and install gauge at M1 port on the track drive motor. See Figure 2
below for M1 Test Port location on motor.
FIGURE 1, MH TEST
PORT AT TRACK DRIVE
MH Test Port at Track Drive
M1 Port
Track Drive Motor
Motor Shift Hose
FIGURE 2,
TRACK DRIVE MOTOR
6. Once the gauge is installed on the track drive motor M1 port, have the operator stroke the pump once again. Use the
Pressure Adjustment Valve to set the Shift Pressure to 1/2 the amount that the track drive pump was set to in Step 2.
See Figure 3 below for pressure adjustment valve location.
PRESSURE ADJUSTMENT EXAMPLE
If the pressure gathered from the MH
Test Port on the track drive motor in
Step 2 was 5200 psi then the adjusted
pressure should be set to 2600 psi.
Pressure Adjustment Valve
Track Drive Motor
FIGURE 3, TRACK DRIVE MOTOR
ADJUSTMENT VALVE
TL/TN-775 M