Tigo ENERGY MODULE MAXIMIZER 2ES Series Скачать руководство пользователя страница 7

4. MAPPING

Plan where to 

place Maximizers

1

2

3

Place Maximizers on the PV mod-

ules in a way that matches the 

map you made using barcodes

Also record the serial numbers of 

GTWY(s) and MMU(s)

Take out Maximizer & remove 

1 barcode sticker. Place the 

sticker on the map, string list, or 

construction drawing to match 

the physical location of the 

Maximizer

MAC ID

MAC ID

1

21

2

22

3

23

4

24

5

25

6

26

7

27

8

28

9

29

10

30

11

31

12

32

13

33

14

34

15

35

16

36

17

37

18

38

19

39

20

40

MMU ID

Site Name:

Unit Name

Unit Name

Gateway ID

Need help? Call us today: North America: 1.888.609.TIGO (8446), International: 00800.CALL.TIGO (2255.8446)

A1

A2
A3
A4
A5
A6
A7

A1 Sticker Here

B1
B2

B3
B4
B5
B6
B7

For 2ES installation:

* Note that MM-2ES Dual Maxi-

mizers will have a single label 

for two modules. 

** Input the barcode only on the 

first module in the pair. The sec-

ond will be filled in automatically.

 

MAP

DONE? Connect terminal in MMU 

Perform GTWY Test: 2.5 on MMU menu

Содержание ENERGY MODULE MAXIMIZER 2ES Series

Страница 1: ...s CA 95032 USA 1 888 609 TIGO 8446 Customer support line toll free in USA 1 888 681 TIGO 8446 Customer support fax toll free in USA 800 CALL TIGO 2255 8446 Customer support line in Europe 1 408 358 62...

Страница 2: ...n connected to the module The installer should use the same caution when handling electrical cables from a PV module with or without the Tigo Energy Mod ule Maximizer attached Installation must be per...

Страница 3: ...apping 5 Configuring the System Online 6 Installing Maximizers 7 Initiating Discovery 8 Connecting Modbus Accessories optional Map For troubleshooting and additional information see our website www ti...

Страница 4: ...GTWY Management Unit Internet 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 SYSTEM OVERVIEW SYSTEM GUIDELINES 1 MMU Up to 7 GTWY and 360 PV modules 1 GTWY Up to 120 PV modules Optimizer 1 MM ES per 1 PV mo...

Страница 5: ...see more in 3 Installing GTWYs 8 05 20 5cm 8 01 20 6cm 8 7 22 1cm 7 36 18 7cm Inverter Ethernet 3 Connections GTWY Cable 2 INSTALLLING MANAGEMENT UNIT MMU DONE Perform Network Test 3 2 on MMU menu WH...

Страница 6: ...istor first 1 2 3 4 5 6 7 18 0 82 2604 793 2604 793 1817 553 1363 415 1090 332 908 276 716 218 20 0 52 2604 793 1714 522 1143 348 857 261 686 209 571 174 456 138 22 0 33 2156 657 1078 328 719 219 539...

Страница 7: ...aximizer MAC ID MAC ID 1 21 2 22 3 23 4 24 5 25 6 26 7 27 8 28 9 29 10 30 11 31 12 32 13 33 14 34 15 35 16 36 17 37 18 38 19 39 20 40 MMU ID Site Name Unit Name Unit Name Gateway ID Need help Call us...

Страница 8: ...5 CONFIGURING SYSTEM ONLINE Option 1 Option 2 https installations tigoenergy com 1 2 2 3 Follow wizard instructions New User Returning User Click on...

Страница 9: ...be connected to the first panel of each pair MAC ID MAC ID 1 21 2 22 3 23 4 24 5 25 6 26 7 27 8 28 9 29 10 30 11 31 12 32 13 33 14 34 15 35 16 36 17 37 18 38 19 39 20 40 MMU ID Site Name Unit Name Uni...

Страница 10: ...iscov ery one by one ensuring that GTWY discovery is complete before moving to the next MMU This may take several minutes to several hours depending on the size of the system 2 1 DISCOVERY MENU ENTER...

Страница 11: ...essories Terminal AC meter or inverter installation manual GND N A DATA DATA To GTWY Modbus Device A Modbus Device B Series connection for multiple similar devices TIGO ENERGY SUPPORT 1 888 609 TIGO 8...

Страница 12: ...cepts female or keying Do not connect any other type Environmental Specifications Operating tempera ture ES 2ES GTWY 30 C to 70 C 22 F to 158 F Operating tempera ture J ES 40 C to 85 C 40 F to 185 F O...

Отзывы: