![Tigo ENERGY MODULE MAXIMIZER 2ES Series Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/tigo/energy-module-maximizer-2es-series/energy-module-maximizer-2es-series_installation-and-safety-manual_1115952007.webp)
4. MAPPING
Plan where to
place Maximizers
1
2
3
Place Maximizers on the PV mod-
ules in a way that matches the
map you made using barcodes
Also record the serial numbers of
GTWY(s) and MMU(s)
Take out Maximizer & remove
1 barcode sticker. Place the
sticker on the map, string list, or
construction drawing to match
the physical location of the
Maximizer
MAC ID
MAC ID
1
21
2
22
3
23
4
24
5
25
6
26
7
27
8
28
9
29
10
30
11
31
12
32
13
33
14
34
15
35
16
36
17
37
18
38
19
39
20
40
MMU ID
Site Name:
Unit Name
Unit Name
Gateway ID
Need help? Call us today: North America: 1.888.609.TIGO (8446), International: 00800.CALL.TIGO (2255.8446)
A1
A2
A3
A4
A5
A6
A7
A1 Sticker Here
B1
B2
B3
B4
B5
B6
B7
For 2ES installation:
* Note that MM-2ES Dual Maxi-
mizers will have a single label
for two modules.
** Input the barcode only on the
first module in the pair. The sec-
ond will be filled in automatically.
MAP
DONE? Connect terminal in MMU
Perform GTWY Test: 2.5 on MMU menu