EI Battery (Including EI BMS)
!
1.1 Package Contents
1.2 System Configuration
BMS:
Index
Item
Quantity
1
BMS
1
2
BMS to Inverter Charging Cable (+) (2.0 m)
1
3
BMS to Inverter Charging Cable (-) (2.0 m)
1
4
BMS to Battery Module Power Cable (120 mm)
1
5
BMS Communication Cable (2.2 m)
1
6
COMM Communication Cable (200 mm)
1
7
Tightening Wrench
1
8
Wall Mounting Bracket
1
9
M5 Screw
4
10
Flat Washer
2
11
Grounding Wire (150 mm)
1
12
Lag Bolt
2
13
Wall anchor
2
14
Wire protector
2
15
Mounting Base
1
16
Safety manual
1
Battery Module:
Index
Item
Quantity
1
Battery Module
1
2
Battery Module Power Cable (690 mm)
1
3
COMM Communication Cable (600 mm)
1
4
M4 Screw
2
5
Grounding Wire (450 mm)
1
6
Quick Start Guide
1
Accessories:
Index
Item
Quantity
1
Battery Module Power Cable (1200 mm)
1
2
Battery Module COMM Communication Cable (1200 mm)
1
3
Grounding Wire (1200 mm)
1
4
Battery Base
1
5
Cover Plate
1
6
Wall Mounting Bracket
2
7
Wire Protector Ring
4
8
M4 Screw
8
9
Wall Bracket Accessories
1
10
Battery Module to BMS Power Cable (2500 mm) [optional]
1
1. General Information - Specifications
ATTENTION - READ FIRST
!
ATTENTION - Use the appropriate QSG's to perform the
physical installation of the EI system in the following order:
1.
EI Battery
2.
EI Inverter
3.
EI Link
4.
EI BMS
Quick Start Guide - EI BMS/TSB-3/EI Battery Accessories
Pg 1 of 3
1.
This document is for general guidance only. Refer to the Energy Intelligence (EI) Inverter Installation & Operations Manual for more detail.
2.
Before installing the system, verify that the package contents are intact and complete as per the packing list. Contact your dealer if there is equipment
damage or missing components.
PN: 002-00111-00 | REV 3.0 | Oct. 21, 2022
2. Installation
The EI Solution is ground mounted. All components stack together to form a complete unit. Extension batteries are installed to the right side of the main cabinet
as shown below.
1.2.1 Single Phase energy storage configuration examples:
2.1 Battery Base
1.
Place the battery base 20 mm away from the wall.
2.
Adjust the battery base levelers if needed. Verify using spirit level.
20 mm
levelers
2.2 Battery Module(s)
1.
Load the battery modules on the base as per Section 1.2.
2.
Secure the batteries on the left and right sides using the provided M4
Screws as shown.
1.2.2 Three phase energy storage system configuration examples:
200-250 mm
200-250 mm
200-250 mm
200-250 mm