background image

E. 

D. 

C. 

B. 

7. Roof Felt

7.a

 Roll out the mineral roofing felt along the lower part of one side of the roof. 

Allow sufficient overhang to fold down onto the roof framing (but not the under

-

side of the roof).

Clout Nails

8. Bargeboards and Finials

40mm Nails

8.a

 Fit the bargeboards to 

the  roof  panels,  trapping 

the overhanging end of the 

felt in between to provide a 

weatherproof seal.

8.b

  Secure  the  diamond 

finials  over  the  top  of  the 

bargeboards.

9.a

 Glaze the windows by securing 

the glass or styrene from the inside 

with the panel pins supplied.

Important: 

All  windows  must  be 

sealed inside and out with silicone or 

any  other  watertight  solution  of  your 

choice (not supplied).

Panel Pins

9. Windows

Tip: 

Leaving the backing film on whilst 

installing  will  prevent  scratches  on 

your styrene or glass. 

7.c

  Fold  the  overhanging  felt  at  the 

gable  ends  under  the  roof  boards 

and tack in place, you could cut the 

felt at the corners to make it fit if you 

wish. 

7.b

 Use clout nails to tack along top edge of felt in to framing. 

Repeat this process on the other side of the roof.

7.d

  On  these  wider  sheds  you 

will  be  provided  extra  felt  to 

cover  the  ridge  of  the  building. 

The ridge piece should overlap 

the  lower  strips  of  felt  equally 

on either side and leave approx 

75mm  (3’’)  of  felt  overhanging 

each end.  

Page 2 of 2

10. Corner Strips

10.a

 Secure the corner strips at each 

corner  of  the  shed  with  the  40mm 

nails provided.

10.b

  Extra  strips  are  provided  to 

cover  the  joins  between  the  gable 

panels.

Important: 

Please  do  not  confuse  these 

corner  strips  as  window  beading.  Also 

please be aware that the strips may need 

cutting to length.

40mm Nails

Check List

4x6 Pack

x1 Floor Panel

x2 Gable Tops

x2 Blank Panels

x1 Window Panel

x1 Door Panel

x1 Door

x2 Roof Panels

x4 Heavy Duty Bearers

x2 600mm Blank Panels

(found in polytube pack)

x4 Bargeboards

x2 Diamond Finials

x6 Corner Strips

Fixing Kit

Instructions

Felt

8x6 Pack

x2 Floor Panels

x2 Gable Tops

x3 Blank Panels

x2 Window Panels

x1 Door Panel

x1 Door

x4 Roof Panels

x4 Heavy Duty Bearers

x1 Truss

x2 600mm Blank Panels

(found in polytube pack)

x4 Bargeboards

x2 Diamond Finials

x8 Corner Strips

Fixing Kit

Instructions

Felt

12x6 Pack

x3 Floor Panels

x2 Gable Tops

x4 Blank Panels

x3 Window Panels

x1 Door Panel

x1 Door

x6 Roof Panels

x4 Heavy Duty Bearers

x2 Trusses

x2 600mm Blank Panels

(found in polytube pack)

x4 Bargeboards

x2 Diamond Finials

x10 Corner Strips

Fixing Kit

Instructions

Felt

Joining the Floor Panels

These are simply butted up against each other. There is no need for any other fixings as the weight of the shed, which is built on 

top, will hold them together. Don’t forget to attach the heavy duty bearers to the panels, one on each end of the completed floor. 

See Image A.

Joining the Side Panels

These are attached using the 50mm screws provided, through the internal framework. You are supplied extra cover strips to cover 

this external join. These can be fitted at the end of the build as you would do with smaller models. 

See Image B.

Internal Trusses (8ft and 12ft Models Only)

Not to confuse these with the gable tops, they can be identified by cladding fixed to both sides of the framing. The truss should be 

fixed by nailing down through the framing in to the side panels using the 65mm nails (Image C). The larger models come with 1 

or 2 trusses to support the weight and joins of the roof, because of the way the Flex Apex is manufactured, assembly of the roof/

trusses varies with each size, please 

See Image D

 and 

E

 below for instructions on 8x6 and 12x6 roofs. 

Roof Panels

These are fitted in much the same way as the smaller model, just to make sure on the larger models that the join of the roof panels 

is centred over the truss. 

See Image D and E.

If you have the 8x6 or 12x6 model, there are a few extra steps you will need to take to 

complete your building. 

11. Larger Models

A. 

12x6.

 Each truss should be positioned to the outside of the join between each side 

panel, to make this more accurate, measure 56mm out from the join and use this 

as the centre point for your truss. You should then attach the centre roof panel first. 

Again make sure the roof panel is centred over the truss. 

56mm

8x6: 

The truss should be centred over the top 

of the join of the two side panels and fixed in 

place. The roof can then be fitted in the same 

way, making sure the join of the two panels is 

over the middle of the truss.

Отзывы: