![Tiger RBF-2C Скачать руководство пользователя страница 65](http://html1.mh-extra.com/html/tiger/rbf-2c/rbf-2c_operators-manual_1114991065.webp)
Operation Section 4-15
OPERATION
RBF-2C 07/04
© 2004
Alamo Group Inc.
For safe and efficient boom mower operation, it is critical that the operator be experienced and feel confident in
using the control valve sticks to position the boom. New operator’s should allow ample time to practice using the
control valve sticks in an open area before entering the worksite. Before attempting to operate this equipment,
read these instructions completely. If you have any questions concerning safety of operation, contact your dealer
or Rhino.
This valve is located on the Main Frame of the unit. These are fastened together in a bank of five valves. Their use
will be explained in the following pages of this manual. Read each explanation carefully then practice in a safe,
level area, CLEAR of all people, animals, and any obstructions. As always, use extreme caution when using
this machine. This valve is controlled by operating the Remote Control Valve Box mounted to the right of the operator
at a convenient height.
NOTE
: The stamped metal plate located above the control valve indicates each valve function.
Practice performing multiple functions simultaneously. With some practice, the control valve sticks will
become very easy to operate and will feel almost as it were an extension of your arm.
With the exception of the relief valves, which are preset at the factory, these are all the controls for operating
the machine other than the controls on the tractor itself.
VALVE OPERATION PLATE P/N 03.541.09
Содержание RBF-2C
Страница 4: ......
Страница 5: ...Safety Section 1 1 SAFETY SECTION...
Страница 33: ...Introduction Section 2 1 INTRODUCTION SECTION...
Страница 35: ...Assembly Section 3 1 ASSEMBLY SECTION...
Страница 42: ...Assembly Section 3 8 RBF 2C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 6...
Страница 47: ...Assembly Section 3 13 RBF 2C 07 04 ASSEMBLY 2004 Alamo Group Inc FIGURE 3 12...
Страница 50: ......
Страница 51: ...Operation Section 4 1 OPERATION SECTION...
Страница 73: ...Operation Section 4 23 OPERATION RBF 2C 07 04 2004 Alamo Group Inc...
Страница 82: ......
Страница 83: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Страница 91: ...RBF 2C OMWPL 07 04 Printed U S A P N 06060000...