Assembly Section 2-23
ASSEMBLY
MAIN BOOM:
“A” Port, Boom UP:
7-9 Seconds
(Note: Extend secondary boom completely; roll deck to be level with ground, and lower
main boom until deck is on ground. Now index main boom “up” function and determine the
time required for main boom to rise completely.)
“B” Port, Boom Down:
6-8 Seconds
(Note: Extend secondary boom completely, roll deck to be level with ground, and raise the
main boom to “full up”. Then index the main boom “down” function to determine the amount
of time required for the deck to contact the ground. CAUTION: Stop the boom just as the
deck contacts the ground.)
SECONDARY
BOOM
:
“A” Port, Boom Out:
7-9 Seconds
(Position main boom full up, roll deck out until deck cylinder is fully retracted, and bring
secondary boom in completely. Then index the secondary boom “out” function and determine
the time required for boom to extend out completely.)
“B” Port, Boom In:
7-9 Seconds
(Position the main boom full up, roll deck out until deck cylinder is fully retracted, and
extend secondary boom completely. Then index the secondary boom “in” function and
determine the time required for boom to come in.)
DECK ROLL:
“A” Port, Deck Out:
5-6 Seconds
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be
articulated without contacting the main boom, and roll deck in until deck cylinder is completely
extended. Then index the deck roll “out” function and determine the time required for the
deck to roll out.)
“B” Port, Deck In:
Target 5-6 Seconds (but DO NOT use Limit Screw)
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be
articulated without contacting the main boom, and roll deck out until deck cylinder is
completely retracted. Then index the deck roll “in” function and determine the time required
for the deck to roll in.)
BOOM
SWIVEL:
“A” Port, Boom Forward:
7-9 Seconds
(Extend booms completely; rotate head to be level with ground, lower main boom until deck
is just above ground, and swivel boom aft and until near tire. Then index the boom swivel
“forward” function and determine the time required for the boom to swivel full forward.)
“B” Port, Boom Aft:
7-9 Seconds
(Extend booms completely; rotate head to be level with ground, lower main boom until deck
is just above ground, and swivel boom full forward. Then index the boom swivel “aft” function
and determine the time required for the boom to swivel aft. Use caution when doing this,
stop boom before main boom contacts tire.)
Содержание JD 5083E
Страница 4: ......
Страница 6: ......
Страница 7: ...Cheetah Safety Section 1 1 SAFETY SAFETY SECTION ...
Страница 21: ...Cheetah Safety Section 1 15 SAFETY 00769737 00725746 002369 ...
Страница 22: ...Cheetah Safety Section 1 16 SAFETY 02962764 02962765 02965262 ...
Страница 23: ...Cheetah Safety Section 1 17 SAFETY 22839 02971123 03200285 22645 ...
Страница 24: ...Cheetah Safety Section 1 18 SAFETY 22840 24028 25387 ...
Страница 25: ...Cheetah Safety Section 1 19 SAFETY 32707 32708 32709 ...
Страница 26: ...Cheetah Safety Section 1 20 SAFETY 33224 33302 33435 ...
Страница 27: ...Cheetah Safety Section 1 21 SAFETY RED 42399 33436 33437 33438 42350 ...
Страница 28: ...Cheetah Safety Section 1 22 SAFETY AMBER 42400 6T3217 6T3219 6T3220 6T3221 ...
Страница 29: ...Cheetah Safety Section 1 23 SAFETY 6T3230 6T3233 6T3222 6T3224 6T3225 ...
Страница 30: ...Cheetah Safety Section 1 24 SAFETY 6T3234 6T3236 6T3237 34206 ...
Страница 31: ...Cheetah Safety Section 1 25 SAFETY 33743 6T3243 TB1011 ...
Страница 32: ...Cheetah Safety Section 1 26 SAFETY 34852 HYDRAULIC TANK ...
Страница 35: ...ASSEMBLY SECTION Assembly Section 2 1 ...
Страница 49: ...Assembly Section 2 15 ASSEMBLY ...
Страница 58: ...Assembly Section 2 24 ASSEMBLY ...
Страница 61: ...Cheetah Operation Section 3 1 OPERATION OPERATION SECTION ...
Страница 74: ...Cheetah Operation Section 3 14 OPERATION INSPECTION SHEETS ...
Страница 79: ...MAINTENANCE SECTION Cheetah Maintenance Section 4 1 ...
Страница 98: ...Cheetah Maintenance Section 4 20 MAINTENANCE ...
Страница 99: ...PARTS SECTION JD 5101E CHEETAH BOOM MOWER Parts Section 5 1 ...
Страница 102: ...Parts Section 5 4 TRACTOR MOUNT KIT MAIN FRAME 5101E ...
Страница 104: ...Parts Section 5 6 TRACTOR MOUNT KIT HYDRAULICS 5101E ...
Страница 106: ...Parts Section 5 8 TRACTOR MOUNT KIT MAIN FRAME 5101E LOADER ...
Страница 108: ...Parts Section 5 10 TRACTOR MOUNT KIT HYDRAULICS 5101E LOADER ...
Страница 110: ...Parts Section 5 12 TRACTOR MOUNT KIT WHEEL WELL TANK ...
Страница 112: ...Parts Section 5 14 TRACTOR MOUNT KIT HYDRO WHEEL WELL TANK ...
Страница 114: ...Parts Section 5 16 BOOM MOUNT KIT BOOM SWIVEL BOOM REST ...
Страница 116: ...Parts Section 5 18 SWITCH BOX AND JOYSTICK 5101E ...
Страница 118: ...Parts Section 5 20 LIFT VALVE JOYSTICK CONTROL ...
Страница 122: ...Parts Section 5 24 LIFT VALVE CABLE CONTROL CAB ...
Страница 128: ...Parts Section 5 30 ...
Страница 129: ...COMMON PARTS SECTION CHEETAH BOOM MOWER ...
Страница 132: ...Cheetah Common Section 6 4 CHEETAH QUICK COUPLERS MAIN BOOM ...
Страница 134: ...Cheetah Common Section 6 6 CHEETAH BOOM ARM ASSEMBLY ...
Страница 136: ...Cheetah Common Section 6 8 CHEETAH ROTARY MOWER DECK ...
Страница 138: ...Cheetah Common Section 6 10 CHEETAH ROTARY PIVOT ASY ...
Страница 140: ...Cheetah Common Section 6 12 DAN FOSS VALVE 06502095 ...
Страница 142: ...Cheetah Common Section 6 14 5SP HUSCO POWER BEYOND 33500 ...
Страница 144: ...Cheetah Common Section 6 16 5SP HUSCO OPEN CENTER 34287 ...
Страница 146: ...Cheetah Common Section 6 18 4SP HUSCO LIFT VALVE FLAIL OPEN CENTER 27671 ...
Страница 148: ...Cheetah Common Section 6 20 CHEETAH ROTARY MOTOR ...
Страница 150: ...Cheetah Common Section 6 22 ROTARY SPINDLE ASSEMBLY ...
Страница 152: ...Cheetah Common Section 6 24 CHEETAH FLAIL HEAD ASSY ...
Страница 154: ...Cheetah Common Section 6 26 CHEETAH FLAIL CUTTER SHAFT ASSY ...
Страница 156: ...Cheetah Common Section 6 28 CHEETAH FLAIL MOTOR ...
Страница 158: ...Cheetah Common Section 6 30 CHEETAH CYLINDER BREAKDOWNS ...
Страница 160: ...Cheetah Common Section 6 32 CHEETAH CYLINDER BREAKDOWNS ...
Страница 167: ...Cheetah Common Section 6 39 JOYSTICK SWITCHBOX SCHEMATIC 06510196 ...
Страница 169: ...Cheetah Common Section 6 41 PAGE INTENSIONALLY LEFT BLANK ...
Страница 174: ...Cheetah Common Section 6 46 HYDRAULIC TROUBLESHOOTING GUIDE ...
Страница 175: ...Cheetah Common Section 6 47 ELECTRICAL TROUBLESHOOTING GUIDE ...
Страница 176: ...Cheetah Common Section 6 48 NOTES ...
Страница 177: ...WARRANTY SECTION Warranty Section 7 1 ...
Страница 178: ... ...
Страница 182: ...Printed in USA Tiger Corporation ...