ASSEMBLY
Assembly Section 2-22
SWIVEL BRACKET MOUNTING
Install the boom swivel bracket onto the boom mounting bracket with the swivel pin. Secure
the pin in place using the capscrews, etc. through the hole in the boss and pin. NOTE: The head
of the capscrew must be toward the front of the tractor.
Install all new swivels and fittings on the swing cylinder with swivel openings facing each
other. Fittings will vary in type and direction depending on your application, refer to your parts
section for more details.
Install bearings in the main frame anchor for the swing cylinder. This may already be done
for you.
Install the swing cylinder between the boom mounting bracket cylinder anchor and the boom
swivel with the pins. Insert roll pins through the top and the bottom hole in the pins.
Now the hoses can be attached from the control valve to the swing cylinder.
(ASM-C-0015)
PREFORMED TUBE INSTALLATION
Lay booms on floor so the side with the nuts welded on is up. If mounting a ditcher head,
only the main boom tube installation is required. Locate all tube clamps and install them loosely
in the welded nuts on the left side of the booms.
Arrange the tubes and hoses as outlined in the parts section diagram. Install the smaller tube
closest to the boom arm, being careful not to pinch the tubes. Place the large tubes outside of
the small tubes. Snug all clamp bolts, but do not tighten. Check all tubes for correct alignment
and that none are pinched or bent. The clamp bolts can now be tightened.
(ASM-C-0016)
MAIN BOOM INSTALLATION
Install the boom swivel into the main frame as shown in the parts section using a hoist. Line up holes
in swivel and main frame for large swivel pin and insert pin. Secure with hardware as shown.
Attach the inner end of the main boom to the swivel bracket with the cylinder anchors positioned
upward, and at a right angle to the tractor. Secure it with the horizontal hinge pin. Secure the hinge pin in
the boss with capscrews, etc. (see Parts Section).
Attach the butt end of the main boom cylinder to the swivel with the cylinder pin and roll pins shown in
the Parts Section.
Install the travel lock on the rod end of the main boom cylinder. This should be facing the butt end of
the cylinder after installation.
Install the fittings and hoses to the main boom cylinder per Parts Section.
GREASE HINGE PIN ZERKS ON BOOM AFTER ASSEMBLY, ONCE UNDER LOAD WITH BOOM
ELEVATED AND AGAIN AT REST WITH BOOM SUPPORTED
(ASM-C-0013)
SWITCHING SIDE MOUNT TO BOOM ARM
If you are changing over from a side mounted mower you must first close the ball valves and
remove the motor hoses from the motor to the solenoid valve. Also remove and replace any
fittings that do not match the ones shown in the parts section diagram.
Next, disconnect all hoses from the control valve. Remove the pin that connects the lift
cylinder to the mast on the main frame. Remove the inner draft beam pin.
At this point the mower should be loose from the tractor.
Remove the two spool valve and mount the four spool valve for the boom according the
diagram in the parts section. Also refer to the parts section for the new hoses that will need to be
used.
(ASM-C-0020)
Содержание BENGAL BRUTE JD 62-6420 CAB
Страница 4: ......
Страница 6: ......
Страница 7: ...SAFETY SECTION Safety Section 1 1 ...
Страница 18: ...Safety Section 1 12 SAFETY 002369 HYDRAULIC TANK 00725746 INSIDE OF CAB 00769737 MOWER DECK PART NO LOCATION ...
Страница 24: ...Safety Section 1 18 SAFETY 33743 INSIDE OF CAB 06550012 INSIDE OF CAB PART NO LOCATION ...
Страница 29: ...Safety Section 1 23 SAFETY 34852 HYDRAULIC TANK TB1011 MOWER DECK ...
Страница 32: ...Safety Section 1 26 SAFETY ...
Страница 33: ...Assembly Section 2 1 ASSEMBLY SECTION JD6X20 BENGAL BRUTE ...
Страница 51: ...ASSEMBLY Assembly Section 2 19 ASM C 0094 ...
Страница 60: ...ASSEMBLY Assembly Section 2 28 ASM DF CALIBRATION LRS 0001 ...
Страница 62: ...ASSEMBLY Assembly Section 2 30 ...
Страница 63: ...Operation Section 3 1 2011 Alamo Group Inc OPERATION SECTION ...
Страница 84: ...OPERATION Boom Operation Section 3 22 2011 Alamo Group Inc OPERATION LEVER 4 BOOM SWIVEL LEVER 5 BOOM SHIELD ...
Страница 108: ...OPERATION Boom Operation Section 3 46 2011 Alamo Group Inc OPERATION ...
Страница 109: ...Maintenance Section 4 1 2011 Alamo Group Inc MAINTENANCE SECTION ...
Страница 116: ...MAINTENANCE Boom Maintenance Section 4 8 2011 Alamo Group Inc MAINTENANCE ...
Страница 137: ...MAINTENANCE Boom Maintenance Section 4 29 2011 Alamo Group Inc MAINTENANCE ...
Страница 139: ...PARTS SECTION JD6X20 BENGAL BRUTE BOOM ...
Страница 140: ...NOTES ...
Страница 142: ...PARTS ORDERING GUIDE 2012 Alamo Group Inc Parts Section 5 4 JD6X20 BENGAL BRUTE ...
Страница 143: ...NOTES 2012 Alamo Group Inc Parts Section 5 5 JD6X20 BENGAL BRUTE ...
Страница 146: ...TRACTOR MOUNT KIT HYDRAULICS 2012 Alamo Group Inc Parts Section 5 8 JD6X20 BENGAL BRUTE ...
Страница 148: ...CABLE CONTROL MOUNTING 2012 Alamo Group Inc Parts Section 5 10 JD6X20 BENGAL BRUTE ...
Страница 150: ...CABLE MANUAL LIFT VALVE 4 SPOOL 2012 Alamo Group Inc Parts Section 5 12 JD6X20 BENGAL BRUTE ...
Страница 152: ...CABLE MANUAL LIFT VALVE 5 SPOOL 2012 Alamo Group Inc Parts Section 5 14 JD6X20 BENGAL BRUTE ...
Страница 154: ...JOYSTICK AND SWITCH BOX MOUNTING 2012 Alamo Group Inc Parts Section 5 16 JD6X20 BENGAL BRUTE ...
Страница 156: ...ELECTRONIC PROPORTIONAL LIFT VALVE 5 SPOOL 2012 Alamo Group Inc Parts Section 5 18 JD6X20 BENGAL BRUTE ...
Страница 162: ...SAFETY LIGHT OPTION 2012 Alamo Group Inc Parts Section 5 24 JD6X20 BENGAL BRUTE ...
Страница 164: ...SOLENOID VALVE SWITCH AND WIRING 2012 Alamo Group Inc Parts Section 5 26 JD6X20 BENGAL BRUTE ...
Страница 167: ...SWITCH BOX SCHEMATIC 2012 Alamo Group Inc Parts Section 5 29 JD6X20 BENGAL BRUTE ...
Страница 168: ...NOTES 1 2012 Alamo Group Inc Parts Section 5 30 JD6X20 BENGAL BRUTE ...
Страница 169: ...COMMON LEGAL REAR STOW PARTS SECTION Common Section 6 1 ...
Страница 170: ...NOTES ...
Страница 173: ...PARTS ORDERING GUIDE 2011 Alamo Group Inc Parts Section 6 5 COMMON LRS ...
Страница 174: ...NOTES 2011 Alamo Group Inc Parts Section 6 6 COMMON LRS ...
Страница 176: ...LEGAL REAR STOW BOOM ASSY 2011 Alamo Group Inc Parts Section 6 8 COMMON LRS ...
Страница 178: ...LEGAL REAR STOW BOOM HYD ASSY 2011 Alamo Group Inc Parts Section 6 10 COMMON LRS ...
Страница 180: ...BOOMREST BENGAL BRUTE 2011 Alamo Group Inc Parts Section 6 12 COMMON LRS ...
Страница 182: ...BOOMREST PANTHER 2011 Alamo Group Inc Parts Section 6 14 COMMON LRS ...
Страница 184: ...LEGAL REAR STOW RTRY PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 16 COMMON LRS ...
Страница 186: ...LEGAL REAR STOW FLAIL PIVOT ASSY 2011 Alamo Group Inc Parts Section 6 18 COMMON LRS ...
Страница 196: ...50IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 28 COMMON LRS ...
Страница 200: ...50IN FLAIL MOWER ASSY PASS THROUGH KNIVES 2011 Alamo Group Inc Parts Section 6 32 COMMON LRS ...
Страница 202: ...63IN FLAIL DRIVE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 34 COMMON LRS ...
Страница 204: ...63IN FLAIL MOWER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 36 COMMON LRS ...
Страница 211: ...NOTES 1 2011 Alamo Group Inc Parts Section 6 43 COMMON LRS ...
Страница 212: ...COOLER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 44 COMMON LRS ...
Страница 214: ...ROTARY MOWER SPINDLE ASSEMBLY 2011 Alamo Group Inc Parts Section 6 46 COMMON LRS ...
Страница 222: ...FRONT HYDRAULIC PUMP 2011 Alamo Group Inc Parts Section 6 54 COMMON LRS ...
Страница 224: ...50IN AND 60IN ROTARY MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 56 COMMON LRS ...
Страница 226: ...50IN AND 63IN FLAIL MOTOR BREAKDOWN 2011 Alamo Group Inc Parts Section 6 58 COMMON LRS ...
Страница 229: ...MANUAL LIFT VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 61 COMMON LRS ...
Страница 231: ...ELECTRONIC LIFT VALVE SCHEMATIC REAR STOW 2011 Alamo Group Inc Parts Section 6 63 COMMON LRS ...
Страница 232: ...ELECTRONIC LIFT VALVE WIRING DIAGRAM 2011 Alamo Group Inc Parts Section 6 64 COMMON LRS ...
Страница 234: ...SELECTOR VALVE SCHEMATIC 2011 Alamo Group Inc Parts Section 6 66 COMMON LRS ...
Страница 236: ...BRAKE VALVE HYDRAULIC SCHEMATIC 2011 Alamo Group Inc Parts Section 6 68 COMMON LRS ...
Страница 237: ...HYDRAULIC TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 69 COMMON LRS ...
Страница 238: ...ELECTRICAL TROUBLESHOOTING GUIDE 2011 Alamo Group Inc Parts Section 6 70 COMMON LRS ...
Страница 239: ...TROUBLESHOOTING 2011 Alamo Group Inc Parts Section 6 71 COMMON LRS ...
Страница 240: ...TROUBLESHOOTING CONTINUED 2011 Alamo Group Inc Parts Section 6 72 COMMON LRS ...
Страница 241: ...CLEAN CUTTER HEAD 2011 Alamo Group Inc Parts Section 6 73 COMMON LRS ...
Страница 242: ...CLEAN CUTTER ASSEMBLY 2011 Alamo Group Inc Parts Section 6 74 COMMON LRS ...
Страница 243: ...CLEAN CUTTER OPERATION 2011 Alamo Group Inc Parts Section 6 75 COMMON LRS ...
Страница 244: ...CLEAN CUTTER OPERATION CONTINUED 2011 Alamo Group Inc Parts Section 6 76 COMMON LRS ...
Страница 245: ...CLEAN CUTTER MAINTENANCE 2011 Alamo Group Inc Parts Section 6 77 COMMON LRS ...
Страница 247: ...CARBIDE TIP REPLACEMENT 2011 Alamo Group Inc Parts Section 6 79 COMMON LRS ...
Страница 248: ...NOTES 2 2011 Alamo Group Inc Parts Section 6 80 COMMON LRS ...
Страница 249: ...FIRE SUPRESSION SYSTEM 2011 Alamo Group Inc Parts Section 6 81 COMMON LRS ...
Страница 250: ...FIRE SUPRESSION SYSTEM PARTS 2011 Alamo Group Inc Parts Section 6 82 COMMON LRS ...
Страница 252: ...FIRE SUPRESSION SYSTEM ELECTRICAL SCHEMATIC 2011 Alamo Group Inc Parts Section 6 84 COMMON LRS ...
Страница 253: ...WETCUT 2011 Alamo Group Inc Parts Section 6 85 COMMON LRS ...
Страница 256: ...WETCUT TANK PLUMBING 2011 Alamo Group Inc Parts Section 6 88 COMMON LRS ...
Страница 258: ...WETCUT SPRAYER HEAD ASSEMBLY 2011 Alamo Group Inc Parts Section 6 90 COMMON LRS ...
Страница 260: ...WETCUT CABLES 2011 Alamo Group Inc Parts Section 6 92 COMMON LRS ...
Страница 261: ...WARRANTY SECTION Warranty Section 7 1 ...
Страница 262: ... ...
Страница 266: ...Printed in USA Tiger Corporation ...