
3
Attention! Section
Correct and Incorrect Working Practices
CAUTION
HAZARDS OR UNSAFE PRACTICES WHICH
COULD
RESULT IN MINOR
PERSONAL INJURY OR PRODUCT OR PROPERTY DAMAGE
1
2
CAUTION - MACHINE RECOVERY
In order to tow the machine, the high-pressure circuit at the
hydrostatic pump must be opened.
To open the pump, follow this procedure:
At the left side of the pump below the floor plate there is one high-
pressure control valve at the top, and another at the bottom.
To activate the hydrostatic transmission bypass:
• release lock nut (2);
• screw in grub screw (1) until flush with top of nut (2);
• tighten nut (2).
• Reverse procedure prior to machine being placed back into
service.
TOWING THE MACHINE
• The maximum towing speed of 2 km/h should not be exceeded.
• The towing distance should not exceed 1 km.