ThoroughClean E10R-36H Скачать руководство пользователя страница 14

 

14 

 

TERMS & CONDITIONS OF SALE: 

 

1.  Work for special build machines will not commence unless a 30% deposit has been made 

and/or official purchase order has been received. 

2.  The final configuration and optional extras are to be agreed to before manufacturing 

commences. An extra cost for changing a model will apply after manufacturing has 
started (if this change leads to extra manufacturing cost or more expensive/extra 
components) and be charged as a variation cost.  

3.  Ownership/title of all equipment remains the property of ThoroughClean until paid for in 

full. Warranty will only be available after this time. 

4.  Warranty is not service. Any calls placed to service equipment will be chargeable to the 

client. Earlier replacement of consumable parts than what is required by the maintenance 
schedule will be at the cost of the client (excluding of course any repairs/replacement of 
parts required under warranty). Please see the LIMITED WARRANTY information 
elsewhere in this document. 

5.  All Rental Spec and Mine Spec model frames will have a hot dip galvanized finish unless 

elsewhere agreed to in a proposal offered to the client. Industrial Spec frames will have a 
painted finish or galvanized finish 

– the latter usually at extra cost. 

6.  Any additional spares, service kits, nozzle kits, etc are excluded, unless otherwise 

mentioned in the proposal to the client.  

7.  Any extra installation and fitting expenses and all electrical or plumbing work required 

during installation will be at the cost of the client. It is the responsibility of the client to 
provide adequate pressured water supply of potable quality 15% more than the required 
flow of the pressure pump specification, and suitable power supply outlet for electrical 
units where applicable. 

8.  No responsibility will be taken for late delivery day due to unforeseen circumstances. 

Please regard building times for special builds and machines out of stock as estimates 
only. 

9.  Sale of this unit/s is on an FOB Bundamba, QLD basis unless otherwise agreed to in 

writing in this proposal and it is the responsibility of the client to insure goods in transit. 

10.  Our price quoted is valid for 30 days only unless stated otherwise elsewhere in the quote. 
11.  Where deposits have been paid on special builds, such deposits will in part or in full 

become non-refundable once building has started. Should a customer decide to cancel 
an order - all labour and a re-stocking and administration fee for components will be 
charged to the customer and the balance (if any) repaid to the customer. Any special 
non-restockable components will be invoiced to the customer. 

12.  All prices quoted are excluding GST and freight unless otherwise stated.  
13.  All prices quoted does not include installation (where applicable) or training unless 

otherwise stated. 

14.  Installation and training service of $90/h available in Brisbane Metro only. Other sites 

subject to additional travel cost.  

15.  IN NO EVENT SHALL THOROUGHCLEAN BE LIABLE FOR ANY INJURY, EXPENSES, 

PROFITS, LOSS OR DAMAGE, DIRECT, INCIDENTAL, OR CONSEQUENTIAL, OR 
ANY OTHER PECUNIARY LOSS ARISING OUT OF THE USE OR INABILITY TO USE 
ANY PRODUCT DESCRIBED IN THIS DOCUMENT.  

 
 
 
 
 
 
 
 
DISCLAIMER: Although care has been taken to ensure the accuracy, completeness and reliability 
of the information provided, technical features may vary due to ongoing improvements and 
development.  The user of the information agrees that the information is subject to change 
without notice. 

Содержание E10R-36H

Страница 1: ...Start up 4 Operating Tips Shutting down Regular Checks 6 Maintenance Schedule 7 8 Trouble Shooting Guide 9 What can cause expensive damage to your machine 10 WARNINGS SAFETY INSTRUCTIONS 11 MEDIC ALER...

Страница 2: ...456 Max Pressure Flow 2200 psi 11 lpm 3000 psi 12 5 lpm 3625 psi 18 lpm Set up de rated pressure flow 1100 psi 11 lpm 2300 psi 12 5 lpm 2800 psi 18 lpm Nozzle size at set up pressure 15060 15045 15060...

Страница 3: ...lly Water will fill the break tank if fitted Unroll the hose fully ensuring there are no kinks in it Trigger gun to expel any air in the system LAST CHECKS START Check all hoses are connected and chec...

Страница 4: ...e and detergent assembly Allow to soak for a few minutes 3 Blast off dirt using high pressure and a bottom up approach 4 Lastly rinse off thoroughly with top down approach SHUTTING DOWN IMPORTANT ALWA...

Страница 5: ...er over heating which damages seals The unit has two safety mechanisms built in to prevent damage o Automatic dumping of hot water when water temp rises above 63 deg C o The Washmate 1 3 and 4 units w...

Страница 6: ...ical equipment as Specified by Law As required by law 12 CONTROL PANEL Have an Authorised Electrician Fully Function Test Repair or Replace all Electrical Components As required or annually 13 Check T...

Страница 7: ...Cavitation or air in the system Check suction hose Increase diameter size for bigger supply Damaged ceramic plunger Replace Plunger Excessive pressure and or temp in the pumped water Check the tempera...

Страница 8: ...dity Replace oil more frequently Piston Seals Worn Cracked Piston Check Replace Water Blasted into Pump via Breather Cap during Cleaning Exercise Care WATER DRIPPING FROM UNDER PUMP Between crankcase...

Страница 9: ...ost through by pass valve and only small increase in pressure is achieved doing this Lost of waster horse power COMMON MISTAKE Put a smaller HP Jet onto lance for higher pressure When orifice is reduc...

Страница 10: ...s bearings on shafts where water penetration would be detrimental NEVER WATER BLAST fragile items surfaces that may be damaged by high velocity water Always carefully test on a small area first ALWAYS...

Страница 11: ...octor what type of project task was being performed at the time of the injury making special note of any chemicals that were used and the quality of the water MEDIC ALERT INFORMATION ALWAYS ENSURE MAC...

Страница 12: ...able loss or damage You are also entitled to have the goods repaired or replaced if goods fail to be of acceptable quality and the failure does not amount to a major failure The benefits to the consum...

Страница 13: ...y period THIS WARRANTY WILL NOT APPLY TO Any part component that has been subject to misuse negligence accidental damage improper or inadequate maintenance or improper storage Any part that has been s...

Страница 14: ...n the required flow of the pressure pump specification and suitable power supply outlet for electrical units where applicable 8 No responsibility will be taken for late delivery day due to unforeseen...

Страница 15: ...3 6 6 10 8 GPM 0 3000 PSI Features all stainless and brass internal parts New design reduces sensitivity to entrapped air No external moving parts or springs Unique barb and flow balance design provid...

Страница 16: ...3 15 16 22 24 25 28 29 INSTALLATION Select an unloader appropriate for the pressure and flow of your system see specification chart This unloading valve is a flow through design and should be mounted...

Страница 17: ......

Страница 18: ......

Страница 19: ...lvola 6 23 0900 30 Valve spring Molla valvola 6 24 0604 10 Valve cage Gabbia valvola 6 25 1801 12 Screw Vite M6x16 12 26 0203 18 Bearing cover Coperchio cuscinetto 2 27 0205 02 Bearing seal Cappellott...

Страница 20: ...istone 18 1 2600 43 Complete seal Packing 18 mm 2600 43 Pacco completo Guarnizioni pistone 18 3 2614 05 Plunger 18 mm 2614 05 Pistone 18 3 2600 28 Complete Valve 2600 28 Valvola completa 1 2608 26 Plu...

Страница 21: ...29 33 6 10 9 8 13 12 14 20 19 11 43 44 45 48 31 32 23 16 25 30 15 16 17 18 27 46 47 24 3 28 7 4 2 26 25 23 16 21 22 13 14 11 18 12 5 Hawk Pompe NMT serie 2011 NMT pumps 2011 series NMT1220S NMT1520S...

Страница 22: ......

Страница 23: ...0 1202 00 Valve plate 6 21 0900 30 Valve spring 6 22 0604 05 Valve cage 6 23 1802 03 Hexagonal screw M8x18 8 24 0500 61 Closed bearing housing 1 25 0601 63 O Ring 1 78x60 05 2 26 0200 06 Roller bearin...

Страница 24: ...T2120RL 2600 77 Plunger Seals 20 mm 1 2600 78 Complete Seals Packing 20 mm 3 2600 68 Plunger 20 mm 3 2600 08 Complete Valve 6 2608 03 Plunger oil Seals 1 2600 69 Complete Manifold 1 3100 13 Connecting...

Страница 25: ......

Страница 26: ...H H H Ha a a aw w w wk k k k N N N NP P P PM M M M1 1 1 15 5 5 52 2 2 25 5 5 5 N N N NP P P PM M M M1 1 1 18 8 8 82 2 2 25 5 5 5 s s s se e e er r r ri i i ie e e e 2 2 2 20 0 0 01 1 1 11 1 1 1 N N N...

Страница 27: ...6 Intermed ring 18mm Diffusore Interm 18 3 7 0002 64 High pressure U seal dia 18mm Anello tenuta U 18 3 8 0603 07 Copper washer G1 2 Guarnizione rame 1 9 1601 20 Brass plug G1 2 Tappo G1 2 1 10 1602 3...

Страница 28: ...rame 11 2 15x0 5 3 35 1200 09 Plunger 18mm Pistone 18 3 36 1400 15 Copper spacer 11 3 24x0 5 Rosetta rame 11 3 24x0 5 3 37 0601 03 O Ring 1 78x7 66 O Ring 1 78x7 66 3 38 0009 04 Teflon ring Anello an...

Страница 29: ...1 A Ferero D Cover H Muller 17 05 2011 Designed by Checked by Approved by Date 1 2 Edition Sheet Date H G T2 K1 T1 K2 H L Q2 S2 t S4 t S3 2 S1 T2 K1 T1 1 3 S6 S5 4 0V 24V 215V 0V TR1 Q1 M1 M2 M3 M4 M...

Страница 30: ...BURNER K1 CONTRACTOR K2 RELAY SET TR1 TRANSFORMER TR2 BURNER TRANSFORMER T1 CIRCUIT BOARD WITH 10 MIN DELAY T2 CIRCUIT BOARD WITH 10 SEC DELAY T3 DELAY CIRCUIT FOR SOLENOID H L IN LINE LAMP H G FUEL L...

Страница 31: ...011 Designed by Checked by Approved by Date 1 2 Edition Sheet Date H G T2 K1 T1 K2 H L Q2 S2 t S4 t S3 2 S1 T2 K1 T1 1 3 S6 S5 4 0V 24V 215V 0V TR1 Q1 M1 M2 M3 M4 M5 M6 L1 L2 T1 T2 K1 K2 K2 M1 1 1 MB...

Отзывы: