Preliminary electrical system checks as contained in the BGC multimeter instructions book are the first
electrical checks to be carried out during a fault finding procedure. On completion of the service/fault
finding task which has required the breaking and remaking of electrical connections, then the checks - A.
Earth Continuity, C. Polarity and D. Resistance to Earth - must be repeated.
Page 14
ILLUSTRATION OF SHORT LIST SPARE PARTS
Apollo - 15/30 30/50 - Maintenance