THORLABS OSL2IR Скачать руководство пользователя страница 5

High-Intensity Fiber Light Source

 

Chapter 3: Getting Started 

Rev A, March 30, 2021 

Page 3 

Chapter 3  Getting Started 

3.1.  Unpacking the OSL2IR 

Check that you received all items mentioned on the packing list below. 

OSL2IR Packing List 

Item

 

Quantity 

OSL2IR Light Source 

OSL2FB Fiber Bundle 

Fiber Bundle Adapter 

1 (Ships Installed in the OSL2IR Output Port) 

User Guide 

Location-Specific Power Cord 

 

3.2. Setup 

Overview 

3.2.1. 

Electrical Power Supply 

1.  Turn off the power to the OSL2IR before making any connections. 

2.  Do not connect the AC power cord to the local power supply until the 

connections are completed to the OSL2IR. 

3.  Be sure to make the connections firmly. 

4.  Be sure that the OSL2IR operating voltage matches the “local” power 

supply. 

3.2.2. 

Fiber Bundle and Light Output Port 

The included OSL2FB fiber bundle can be connected to the OSL2IR light source 
for easy control and placement of the illumination. Additionally, the fiber bundle 
adapter can be removed from the output port of the OSL2IR. Unscrew the fiber 
bundle adapter to expose the internal SM1 (1.035"-40) threads. This threaded 
output port can be used for a variety of free space applications. See Section 4.1 
for details on the location of the output port and operating controls of the OSL2IR. 

Содержание OSL2IR

Страница 1: ...OSL2IR High Intensity Fiber Light Source User Guide...

Страница 2: ...wer Supply 3 3 2 2 Fiber Bundle and Light Output Port 3 Chapter 4 Physical Description 4 4 1 Front Panel Light Source Descriptions 4 4 2 Rear Panel Light Source Descriptions 4 Chapter 5 Lamp Replaceme...

Страница 3: ...ymbol Description Direct Current Alternating Current Both Direct and Alternating Current Earth Ground Terminal Protective Conductor Terminal Frame or Chassis Terminal Equipotentiality On Supply Off Su...

Страница 4: ...1 Power Sources Before operating the product check that the operating voltage is identical to your local power supply See specific descriptions for operating voltages To disconnect the AC power cord g...

Страница 5: ...t the AC power cord to the local power supply until the connections are completed to the OSL2IR 3 Be sure to make the connections firmly 4 Be sure that the OSL2IR operating voltage matches the local p...

Страница 6: ...witch 3 Light Output Port 4 LED Indicator Indicates lamp temperature status The LED will be green when the lamp temperature is normal If the lamp overheats it will turn to red and power to the lamp wi...

Страница 7: ...aution Lamp and surfaces may be extremely hot after operation 3 Pull the paddle latch handle to open the bulb cover 4 Remove the bulb socket and carefully pull the bulb out from the bulb bracket 5 Ins...

Страница 8: ...50 60 Hz 200 240 VAC 50 60 Hz Fuse Type 3 A 250 V 5 x 20 mm Power Consumption 200 W at Maximum Bulb Intensity Operating Temperaturea 20 to 40 C 4 to 104 F Humidity Range 0 to 80 Non Condensing Weight...

Страница 9: ...High Intensity Fiber Light Source Chapter 6 Specifications Rev A March 30 2021 Page 7 Figure 4 Dimensional Drawing...

Страница 10: ...r 7 Certifications and Compliances This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this d...

Страница 11: ...Thorlabs products such as Pure OEM products that means assemblies to be built into a unit by the user e g OEM laser driver cards Components Mechanics and optics Left over parts of units disassembled...

Страница 12: ...tion USA Canada and South America Thorlabs Inc sales thorlabs com techsupport thorlabs com UK and Ireland Thorlabs Ltd sales uk thorlabs com techsupport uk thorlabs com Europe Thorlabs GmbH europe tho...

Страница 13: ...www thorlabs com...

Отзывы: