BP209 Series
7 Operation Instructions
Page 70
21424-D02
7.1.3.3 Save Test Protocol
To save a Test Protocol in pdf format select "File
à
Save Test Protocol".
A dialog box opens:
Here, additional information can be entered in order to save it together with the test report.
The results of the measurement are saved to a compact test protocol. It contains the Beam
Profiler data and settings and
selected numerical calculation results
. If the Reconstruction
and the 3D Profile windows were activated, these plots will also be included.
45
Содержание M2MS
Страница 2: ...Copyright 2022 Thorlabs Version Date 8 1 14 Feb 2022 ...
Страница 73: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 71 Example ...
Страница 92: ...BP209 Series 7 Operation Instructions Page 90 21424 D02 ...
Страница 119: ...BP209 Series 7 Operation Instructions Rev 8 1 14 Feb 2022 2022 Thorlabs Page 117 ...
Страница 151: ...BP209 Series 11 Appendix Rev 8 1 14 Feb 2022 2022 Thorlabs Page 149 Typical Responsivity Extended InGaAs Photodiodes ...
Страница 154: ...BP209 Series 11 Appendix Page 152 21424 D02 11 7 Drawing BP209 Drawing BP209 Series Imperial Version ...
Страница 155: ...BP209 Series 11 Appendix Rev 8 1 14 Feb 2022 2022 Thorlabs Page 153 Drawing BP209 Series Metric Version ...
Страница 157: ...BP209 Series 11 Appendix Rev 8 1 14 Feb 2022 2022 Thorlabs Page 155 11 9 Drawing BP209 Mounting Adapter ...
Страница 158: ...BP209 Series 11 Appendix Page 156 21424 D02 11 10 Drawing M2MS BP209 ...
Страница 162: ...BP209 Series 11 Appendix Page 160 21424 D02 11 14 Certifications and Compliances ...
Страница 167: ...www thorlabs com ...