Thomasville Nouveau series Скачать руководство пользователя страница 2

Remove the existing cabinets and counter tops as well as any mouldings around windows or doors, and any baseboards that 
may be in the way of your installation. Be careful when removing upper cabinets from the wall. It is best to have two sets of 
hands to support the old cabinet’s weight when removing the last of the screws. This will help prevent it from falling, causing 
injury and/or damage.

Repair any damage to wall surfaces that may show after you’ve installed your new cabinets.

4

 Helpful Hint: To help visualize the location of the new cabinets it may help to draw an 

outline on the walls where they will be attached. Simply measure the widths of the cabinets 
and transfer the measurements to their respective walls.

84

3

0

34 

5

/

8

Pencil line on wall (top of cabinets)

Pencil line on wall (top of base cabinets)

Fridge

Range

Sink

4. 

Preparing to install your new cabinets

Locate electric, gas or water lines running behind the walls.  You may need to cut openings in the back panel of the cabinet(s) 
to accommodate the utilities before installation, and you will also want to be sure to avoid accidentally damaging those utilities 
during installation. Mark the location of all of the studs on the walls that are to support the new cabinets. Use a magnetic 
stud finder or a hammer and small finishing nail to accomplish this. It is very important that cabinets are firmly attached to wall 
studs for the optimum amount of support. Be sure to avoid electric, gas, or water lines, or other utilities that might be behind 
the wall when locating the studs, and whenever drilling into the wall or driving a screw.

Houses can become unlevel over long periods of time due to settling and shifting. It is important to determine where the 
highest point in the floor is along the walls where you are going to install your cabinets. Check the floor with a level to 
determine the highest point.

Using a chalk line or straight edge, draw a level line at 34-5/8” from the highest point on the floor on the wall where the new base 
cabinets will be installed. This line establishes the base cabinet height. Now, measure up 84”(or the height of your cabinetry) from 
the same high point in the floor and draw a similar level line on the wall where your wall cabinets will be installed. This line establishes 
the top of the wall cabinet height.

Remove the packaging as well as all of the doors, drawers, false fronts and any adjustable shelving from the new cabinets. 
This procedure will help to reduce the weight and prevent injury or damage from falling shelves, swinging doors and sliding 
drawers during the initial installation phase.

Your cabinets are equipped with fully adjustable clip hinges for easy door removal. You’ll find the clip at the end of the hinge 
facing the inside of the cabinet. Simply squeeze the clip and the hinge will release without changing the door adjustment.

Содержание Nouveau series

Страница 1: ...contact with utilities behind a wall during installation please contact a licensed contractor to install the cabinetry tools needed Pencil Square Pry bar Hammer Miter saw Safety glasses Shims Caulk g...

Страница 2: ...s very important that cabinets are firmly attached to wall studs for the optimum amount of support Be sure to avoid electric gas or water lines or other utilities that might be behind the wall when lo...

Страница 3: ...pport the counter top and keep the cabinets square It may be helpful to install the round base corner cabinet to the adjacent cabinet before leveling and positioning If there is no adjacent cabinet to...

Страница 4: ...ets Be sure to center the cabinet above the stove and between any window openings your cabinetry will surround After checking the cabinet to ensure that it is level and plumb secure it through the upp...

Страница 5: ...ethod would be to install the filler against the side of the cabinet as in Figure B 4 Helpful Hint When determining the location of your fillers during the planning stage it is wise to place them if p...

Страница 6: ...oles Tip Make a jig by measuring and marking the drill locations for knob and or pulls to aid in decorative hardware installation Cardboard jig Scrap block Door 9 Continuing care Our finishes feature...

Страница 7: ...hanism at front of drawer A Vertical Adjustment Slide front of box Figure 8 clip adjustment melamine and hardwood Melamine and Hardwood drawer boxes are attached with figure 8 clips The oval shaped sl...

Отзывы: