IS---0359

March 2010

Page 2 of 4

STEP 1

CABLE TRAINING

A. Train cable as shown to ease

operation.

B. Cut excess cable squarely at center

line of bushing.

Excess

Cable

Center

Lines

20” min.

beyond end

of cable

Pad Mount Transformer

STEP 2

CABLE PREPARATION

(Use cable cut back template for

dimensional guide.)

A. Unwrap and bind concentric neutral

wires 8---1/2” back from end of cable.

B. Remove shield and insulation from

the cable end. Cut squarely taking

care not to nick conductor.

C. Wire brush bare aluminum conductors

and immediately install compression

lug. Rotate to spread inhibitor.
Position compression lug so the

CONTACT THREADED HOLE ALIGNS

WITH THE BUSHING BORE. (Refer to

crimp chart packaged with compression

lug for recommended crimp tool

information.) Start crimp at the crimp

line

mark.

Rotate

180

_

each

successive crimp. Carefully wipe

excessive inhibitor from the outside

of the lug and cable.

D. Remove insulation shield as shown.

Bevel insulation end 1/8” max.

E. Thoroughly clean insulation to

remove all traces of conductive

residue.

8---1/2”

2---1/8”

Start Crimp Here

Bind

Align lug thread

to bushing bore.

6---7/8”

1/8

” Max.

Bevel

Insulation

Insulation

Shield

Straight, Smooth & Squared

Do not cut or nick insulation.

C

A

B

LE

C

U

T

B

A

C

K

TE

M

P

LA

TE

6

---7

/8

2

---1

/8

8

---1

/2