
4
Installation
Unpack and carefully check that there is no transportation damage before using the unit. Keep
the equipment packaging. To fully protect the device against vibration, dust and moisture
during transportation or storage use the original packaging or your own packaging material
suitable for transport or storage, respectively.
The device is designed for installation on the floor or on a flat surface and may never be posi‐
tioned more inclined than 15° in operation.
The device requires 20 cm clearance at the sides and above.
NOTICE!
Possible staining
The plasticiser contained in the rubber feet of this product may possibly react
with the coating of your parquet, linoleum, laminate or PVC floor and after some
time cause permanent dark stains.
In case of doubt, do not put the rubber feet directly on the floor, but use felt-pad
floor protectors or a carpet.
Installation
fog machine
18
Содержание Stairville VF-1200 DMX VertiFog CO2 FX
Страница 1: ...VF 1200 DMX VertiFog CO2 FX fog machine user manual ...
Страница 4: ...11 Protecting the environment 37 Table of contents fog machine 4 ...
Страница 23: ...Connections Connections and operating elements VF 1200 DMX VertiFog CO2 FX 23 ...
Страница 25: ...Multi function control panel Connections and operating elements VF 1200 DMX VertiFog CO2 FX 25 ...
Страница 38: ...Notes fog machine 38 ...
Страница 39: ......
Страница 40: ...Musikhaus Thomann Hans Thomann Straße 1 96138 Burgebrach Germany www thomann de ...