5.3.1 Electrical installation with cable glands
In order to carry out an EMC-compatible installation the cable screen/shielding (except the supply
cable, which, in general, is not shielded) is to be connected to the contact spring of the screwed
cable gland
1. With the Standard Contacting (see Figure 11.1)
- Strip back the outer sheath and screen (shielding)
-
Make a round cut in the outer sheath approx. 15 mm along but do not remove the sheath
-
Guide the cable through the cable gland
-
Pull off the outer sheath
-
Pull back the cable until the connection is made between the cable screen and contact
spring
-
Turn shut… and it is ready for use!
2. With thin Wires without an Inner Sheath (see Figure 11.2)
-
Strip back the outer sheath
-
Pull back the screen braid approx. 15-20mm over the outer sheath
-
Insert the cables into the cable gland until the contact is made between the cable screen
and contact spring
-
Turn shut ….and it is ready for use!
3. When Routing the Cable Screen to another Connection (see Figure 11.3)
-
Expose the screen braid approx. 10 mm
-
Guide the cable through the cable gland until the connection is made between the cable
screen and contact spring
-
Turn shut…and it is ready for use!
Figure 11: Screen cable connection to the cable gland