THERMOSTAHL ECOWOOD PLUS Скачать руководство пользователя страница 7

BOILER MOUNTING 

 

 

3.

 

BOILER MOUNTING 

3.1.

 

Transportation and delivery 

The boiler is delivered on wood pallet, well positioned with metal plates. Remove them carefully 
by unscrewing the screws holding them in place.  
The loading and unloading of the boiler must be performed with a forklift or a crane.  
 

The  boiler  is  very  heavy.  Do  not  try  to  lift  by  hands  or  other  unsuitable 
equipment. Danger of injury! Perform all moves with extreme caution. 

 
Remove  the  boiler  packaging  with  attention.  Keep  the  packaging  material  away  from 
children since it can be dangerous. 
After having unpacked everything, make sure that the 
appliance is intact and undamaged. In case of doubt do not use the appliance and inform the 
supplier.  
The ECOWOOD boiler is delivered with the following equipment already fitted and mounted: 

 

Boiler steel body 

 

Glasswool insulation mounted on the boiler body and tightened with plastic tapes 

 

Metal covers mounted on the boiler body 

 

Turbinators positioned inside the fire tubes  

 

Digital control panel (PLUS version) 

The  following  accessories  are  positioned  inside  the  boiler  body.  Remove  them  carefully  by 
opening the upper door.   

 

Cleaning tools   

 

Chain regulator (STANDARD version) 

 

Fan and fan cover (PLUS version) 
 

In the documentation folder you will find: 

 

Technical manual 

 

Warranty leaflet 
 
 

3.2.

 

Boiler room 

3.2.1.

 

General requirements  

The boiler must be installed in a special and separate room. This room must be chosen so that 
it offers easy access for fuel transport, air supply and exhaust gas evacuation. The doors of the 

boiler room must be metallic, open outwards, and have at least 0,9 m width.  

The  boiler  installation  is  prohibited  in  rooms  with  extensive  dust,  dangerous 
gases, and moist spaces.  

For  the  correct  boiler  function  it  is  necessary  that  the  boiler  room  has  openings  for  natural 
ventilation and combustion air supply. It is recommended that two different openings are used 
for this purpose, positioned on opposite walls and diagonally to ensure good air circulation. The 
total surface of the openings must be at least 1/12 of the boiler room surface. Forced ventilation 
is prohibited in the boiler room.  
The boiler room must be provided with a drainage channel. All safety devices must be connected 

to this channel.  
The boiler room must have an appropriate fire extinguishing system, according to the regulations 
in force. In case that the building is designed with a fire alarm system, a smoke detector must 

be positioned on top of every boiler.  
The fuel storage is prohibited in the boiler room. If so, the storage must be separated from the 
boiler with a non-flammable wall, and proper distanced from the boiler.    
 

Содержание ECOWOOD PLUS

Страница 1: ...SOLID FUEL BOILER ECOWOOD STANDARD PLUS INSTALLATION AND USER MANUAL VERSION 2 2 UPDATE 20 08 2017...

Страница 2: ...ONNECTIONS 13 5 1 General instructions 13 5 2 Control panel functions PLUS VERSION 13 5 3 Electrical connections PLUS VERSION 15 5 4 Hydraulic function scheme 16 5 5 Connecting exhaust temperature sen...

Страница 3: ...f the appliance unless you have contacted the company and an authorized service contractor Only original accessories and spare parts must be used to ensure correct and safe function Make sure you resp...

Страница 4: ...etrical construction causes a high yield DESCIPTION OF COMPONENTS Steel boiler body with cylindrical heat exchanger Removable rear smoke box with inspection cleaning door Upper door for ignition fuel...

Страница 5: ...45x475 1380 1320 650 1015 1300 1190 2 220 ECW 60 345x475 1380 1320 650 1015 1400 1290 2 220 Nominal output is obtained with good quality wood with 15 humidity TECHNICAL DATA Boiler Type Nominal Output...

Страница 6: ...nominal data presented in this manual are calculated for humidity content 15 For proper and efficient function and a long lifespan it is strictly recommended that only dry wood is used with a humidit...

Страница 7: ...n In the documentation folder you will find Technical manual Warranty leaflet 3 2 Boiler room 3 2 1 General requirements The boiler must be installed in a special and separate room This room must be c...

Страница 8: ...boiler s efficient and safe function The chimney must be positioned if possible in the interior of the building It must be vertical with no changes in the direction The cross section of the chimney c...

Страница 9: ...BOILER MOUNTING 9 Each boiler should be connected to an independent chimney Connection of multiple boilers to the same chimney is not recommended Fig 3 Chimney distances Fig 4 Chimney connection...

Страница 10: ...of the boiler a three way thermostatic valve Having a return temperature less than 55o C is very dangerous for the boiler long life and can cause warranty loss 4 3 Filling the system After completing...

Страница 11: ...ERSION ECOWOOD STANDARD is equipped with an air door on the lower part and is delivered with chain thermostatic regulator Install the regulator at the connection pipe on the upper side of the boiler a...

Страница 12: ...ssure reducer 17 Drainage valve F Filter 18 Cold water valve A Air relief valve 19 24 One way valves FD Water softener 4 5 2 Closed expansion vessel connection Legend 1 9 Separation valves B Hot water...

Страница 13: ...ERMOSTAHL ROMANIA SRL declines any liability for damage caused to people animals and goods due to defects caused by faulty electrical connections or lack of connecting the boiler to an efficient groun...

Страница 14: ...thermostat 11 Service menu symbol 12 Hot utility water temperature sensor 13 Boiler pump symbol 14 Hot utility water pump symbol HUW 15 Boiler temperature sensor 16 Exhaust temperature sensor 17 Airfl...

Страница 15: ...n Terminals L N and number 1 8 are intended only for connecting devices with mains supply 230V Terminals 9 20 are intended for cooperation with low voltage devices below 12 V Tips of the connected wir...

Страница 16: ...preset boiler temperature in order to fill the hot utility water tank After filling the hot utility water tank the hot utility water pump can continue work for a preset time in order to collect heat f...

Страница 17: ...n sensor should be installed in such distance from the boiler at which it is not directly exposed to flames and where the emission temperature does not exceed 450 C 5 6 Connecting temperature sensors...

Страница 18: ...he upper door fire chamber and introduce a sufficient amount of small and thin pieces of wood Using sheets of thin paper light the wood placed inside the boiler Close the door of the boiler Wait sever...

Страница 19: ...method is based on boiler temperature indications T1 it consists in constant smooth modulation of the fan revolutions in order to stabilize the preset boiler temperature The regulator itself selects t...

Страница 20: ...preset emission temperature and increase it in the opposite case The preset boiler temperature is in this method of secondary importance it prevents exceeding undesirable temperature of the boiler It...

Страница 21: ...upply The flame is too fast dry and might make a noise 6 7 Supervision mode After the boiler has reached the preset temperature it will enter in SUPERVISION mode In the SUPERVISION mode the fan is ena...

Страница 22: ...move the turbinators from the tubes and clean the tubes with the appropriate tool Afterwards clean the exterior surface of the cylindrical heat exchanger with the exchanger cleaning tool as shown in F...

Страница 23: ...and pumps function properly 7 3 2 Weekly maintenance The boiler must be cleaned every 3 4 days or at least once a week depending on the ash quantity accumulated on the boiler walls and in the heat ex...

Страница 24: ...hly all the surfaces of the boiler as described in the corresponding paragraph Also clean the chimney box and all the chimney parts where ash might be deposited After cleaning all the ash empty the as...

Страница 25: ...the boiler but low temperature at the radiators too high hydraulic resistance in the heating network thermostatic mixing valve is connected wrong increase the pump speed check replace the mixing valve...

Страница 26: ...care utilizeaz combustibili solizi cu nc rcare manual i automat cu puterea util mai mic sau egal cu 500 kW Terminologie cerin e ncercare i marcare Heating boilers Part 5 Heating boilers for solid fuel...

Страница 27: ...THERMOSTAHL ROMANIA HEATING SYSTEMS S R L DRUMUL OSIEI 57 59 sector 6 Bucharest 062395 Romania www thermostahl ro...

Отзывы: