Installing your thermostat
Switching on your system
It is important that all adhesives and
grouting is dry and fully cured before you
switch on your underfloor heating.
Most adhesives take between 7 to 10 days
to cure. Follow manufacturer guidelines.
The temperature of your underfloor heating
should be increased gradually to avoid
thermal shock in the floor. Start at 15°C
and work up to your desired temperature
2-3°C per day.
Observe any maximum temperature
guidelines from your floor manufacturer.
Wait for
7 - 10 Days
before you
switch on
!