background image

5

20. 

Install  junction  box  lid  and  twist  hand  tight. 

Insert screwdriver into ratchet slots located on 

side of junction box base.

22. 

Lid latch mechanism fully engaged. To remove 

lid, repeat steps 20 and 21 but in the opposite 

direction.

21. 

Use screwdriver to ratchet on junction box lid. 

Lid will rotate 30 degrees.

A2. 

Insert two cables into expediter.

A1. 

Cut end of cable at angle to aid in piercing 

grommet. Leave additional cable for expansion 

loop.

In-line Splice Layout Tips

INSTALLATION PROCEDURES

Wiring Details Two Conductors

B3. 

Wiring Details: End Termination. Install jumper 

to terminal block. 

B2. 

Wiring Details: In-Line Splice

B1. 

Wiring Details: Single Phase Circuit

Heat Tracing

Power Supply

 

L1

 

PE

Heat Tracing

Heat Tracing

Отзывы: