background image

3

Terminator

TM

 ZL                             

INSTALLATION PROCEDURES

1. 

Locate bus connection (HPT and FP only) and 

cable as shown. Cut end of cable at angle to aid 

in piercing grommet. Leave additional cable for 
expansion loop. See page 4 for multiple cable 
installation tips.

4. 

Insert banding guide into expediter and snap 
into place.

2. 

Insert cable into expediter. If mounted on 

bottom or side of pipe, punch out weep hole.

Note: For HPT and FP cable, exchange grommet in 

Terminator with GRW-G provided in PETK-3.

3. 

Slide expediter toward pipe and route cable 
through support base entry.

7. 

Terminate  cable  with  appropriate  PETK 
termination  kit.  Refer  to  PETK  installation 
instructions.

8. 

Push excess cable back through expediter. 
Tighten cap securely. Tape cable expansion loop 
to pipe.

9. 

Mount junction box base on expediter. Make 
sure to align slots to properly orient junction 
box base. If mounting horizontally, threaded 

gland holes must face downward.

5. 

Mount expediter to pipe using pipe band. Do 
not band over cable.

6. 

Cut off end of cable.

Отзывы: