3
Terminator
TM
ZL
INSTALLATION PROCEDURES
1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid
in piercing grommet. Leave additional cable for
expansion loop. See page 4 for multiple cable
installation tips.
4.
Insert banding guide into expediter and snap
into place.
2.
Insert cable into expediter. If mounted on
bottom or side of pipe, punch out weep hole.
Note: For HPT and FP cable, exchange grommet in
Terminator with GRW-G provided in PETK-3.
3.
Slide expediter toward pipe and route cable
through support base entry.
7.
Terminate cable with appropriate PETK
termination kit. Refer to PETK installation
instructions.
8.
Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion loop
to pipe.
9.
Mount junction box base on expediter. Make
sure to align slots to properly orient junction
box base. If mounting horizontally, threaded
gland holes must face downward.
5.
Mount expediter to pipe using pipe band. Do
not band over cable.
6.
Cut off end of cable.