Terminator
TM
DE-B Beacon
LED End of Circuit Light Kit
INSTALLATION PROCEDURES
Страница 1: ...TerminatorTM DE B Beacon LED End of Circuit Light Kit INSTALLATION PROCEDURES...
Страница 2: ...roups A B C D Zone 2 IIC T6 Class II Division 2 Groups F G Class III Certifications Approvals Installation Precautions To minimize the potential for arcing and fire caused by product damage or imprope...
Страница 3: ...mounted on bottom of pipe punch out weep hole 6 Cut off end of cable 7 Terminate cable with appropriate SCTK termination kit Refer to SCTK installation instructions Push excess cable back through expe...
Страница 4: ...o change without notice Form No 50843 0411 Locked Position 11 To remove cap lift latch mechanism as shown and unscrew cap De energize all power sources before opening enclosure 10 Engage threads Rotat...