Thermolec DCC-9-BOX Скачать руководство пользователя страница 6

6

DCC INSTALLATION

STEP 1: CHECK THE PACKAGE CONTENTS

1 x DCC-9-BOX 

or 1 x DCC-9-BOX-3R

1 x Ceiling 

mounting support

1 x Installation 

manual

STEP 2: PREPARATIONS FOR INSTALLATION

1. Disconnect the main power 

2. Select the DCC intended location.

The DCC can be mounted:
- on a ceiling 
- on a wall 

NOTE: The DCC controller must be mounted so that the nameplate 
remains visible at all times. 

Do not install the DCC:
- Outdoor, unless the DCC is ordered with our NEMA 3R enclosure.
- In a location with high level of risk.
- Nearby inflammable materials, explosives or fuels, chemical 

products and vapors. 

 

 INSTALLATION VIDEO 

To access our installation video,  

visit our website www.dccelectric.com 

TYPICAL INSTALLATION

 

 NOTES 

For outdoor installation, use our NEMA 3R enclosure 

(DCC-9-BOX-3R). 

DCC-9 

with 

METER STACK

DCC-9

Meter Stack

Main Breaker

Panel of 

the Unit

EV Charger

compatible with 

all models

DCC-9

Main 

Disconnect

Panel

Electrical 

Meter

EV Charger

compatible with 

all models

DCC-9

Sub Panel

Main 

Panel

Electrical 

Meter

EV Charger

compatible with 

all models

DCC-9 

with 

MAIN DISCONNECT

DCC-9 

with 

SUB PANEL

FOR

 HOMES

FOR

 C

ONDOS

Содержание DCC-9-BOX

Страница 1: ...208V Monophas 60A 70A 80A 90A 100A 125A APPROVED MARKET North America MARCH AGR Am rique du Nord MODELS MOD LES DCC 9 BOX DCC 9 BOX 3R V2 IFRAN AISI IENGLISHI Read and save these instructions Lire et...

Страница 2: ...2...

Страница 3: ...3 TABLE OF CONTENTS About This Manual 4 Safety Information 4 Specifications 5 Characteristics 5 Typical Installation 6 DCC Installation 6 Maintenance 8 IENGLISHI...

Страница 4: ...in accordance with the latest electrical code requirements Notes It is recommended to schedule the charging of the vehicle during hours of low electrical consumption to minimize interruptions to the e...

Страница 5: ...EC LTE E warrants the inte grated controls against any defects for a period of one year from the shipping date The warranty is limited to the equipment and components supplier by THERMOLEC LTE E 2 In...

Страница 6: ...enclosure In a location with high level of risk Nearby inflammable materials explosives or fuels chemical products and vapors INSTALLATION VIDEO To access our installation video visit our website www...

Страница 7: ...done in any direction WARNING Warranty automatically void if the DCC is installed incorrectly STEP 3 INSTALLATION Ceiling installation 1 Remove the 4 cover screws 2 Fix the ceiling mounting support on...

Страница 8: ...8 TABLE DES MATI RES propos de ce manuel 9 Information de s curit 9 Sp cifications 10 Caract ristiques 10 Exemples d installation 11 Installation du DCC 11 Maintenance 12 FRAN AIS...

Страница 9: ...45 C Toujours entreposer le DCC Contr leur de charge pour v hicules lectriques dans des temp ratures sup rieures ou inf rieures de 4 F 158 F 20 C 70 C Proc der l installation du DCC Contr leur de cha...

Страница 10: ...onsabilit de l installa teur de s assurer que la source d ali mentation lectrique soit suffisante pour permettre l utilisation d un ou de plusieurs DCC Contr leur de charge pour v hicules lectriques N...

Страница 11: ...g proximit de mat riaux inflammables explosifs ou combustibles produits chimiques et des vapeurs VID O D INSTALLATION Pour visionner notre vid o d installation visitez le www dccelectrique com EXEMPLE...

Страница 12: ...TTENTION Garantie automatiquement annul e si l installation du DCC est non conforme TAPE 3 INSTALLATION Installation au plafond 1 Enlever les 4 vis du couvercle 2 Fixer le support d installation pour...

Отзывы: