![Thermolec DCC-9-BOX Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/thermolec/dcc-9-box/dcc-9-box_installation-manual_1105733006.webp)
6
DCC INSTALLATION
STEP 1: CHECK THE PACKAGE CONTENTS
1 x DCC-9-BOX
or 1 x DCC-9-BOX-3R
1 x Ceiling
mounting support
1 x Installation
manual
STEP 2: PREPARATIONS FOR INSTALLATION
1. Disconnect the main power
2. Select the DCC intended location.
The DCC can be mounted:
- on a ceiling
- on a wall
NOTE: The DCC controller must be mounted so that the nameplate
remains visible at all times.
Do not install the DCC:
- Outdoor, unless the DCC is ordered with our NEMA 3R enclosure.
- In a location with high level of risk.
- Nearby inflammable materials, explosives or fuels, chemical
products and vapors.
INSTALLATION VIDEO
To access our installation video,
visit our website www.dccelectric.com
TYPICAL INSTALLATION
NOTES
For outdoor installation, use our NEMA 3R enclosure
(DCC-9-BOX-3R).
DCC-9
with
METER STACK
DCC-9
Meter Stack
Main Breaker
Panel of
the Unit
EV Charger
compatible with
all models
DCC-9
Main
Disconnect
Panel
Electrical
Meter
EV Charger
compatible with
all models
DCC-9
Sub Panel
Main
Panel
Electrical
Meter
EV Charger
compatible with
all models
DCC-9
with
MAIN DISCONNECT
DCC-9
with
SUB PANEL
FOR
HOMES
FOR
C
ONDOS
Содержание DCC-9-BOX
Страница 2: ...2...